Laserfiche WebLink
0 6 <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> SITE HEALTH AND SAFETY PLAN <br /> PART I PART II <br /> GENERAL SITE INFORMATION EVALUATION OF POTENTIAL HAZARDS <br /> 1. Site Name:Tokay Shell 1. Chemicals Hazards <br /> Address:420 W.Kettleman Ln,Lodi ®Carcinogens:Gasoline,Diesel,Waste Oil <br /> Contact Person:Sukh Singh Phone No:369-2790_ ❑Corrosives: <br /> Sweeps Number: ❑Dusts: <br /> Proposed Date of investigation/inspection:January 26,2007 ❑Explosives: <br /> ❑Flammables: <br /> 2. Description and brief narrative of inspection activity: ❑Inorganic Gases: <br /> ❑New UST installation.. ❑UAR Investigation. ❑Metals: <br /> ❑Tank Closure in Place.. ❑Tank/Pipe Repair. ❑Oxidizers: <br /> ❑Tank/Pipe Removal. ❑Re-excavation. ❑PCB's: <br /> ❑Installation of Borings/Monitoring Wells. <br /> ®Hazardous waste inspection ❑ Sampling PART III <br /> ❑Tiered Permitting inspection <br /> 3. Specific Site Information: REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br /> Tank No.: Tank Capacity: I. Monitoring Equipment(note:Monitoring instruments must be used for all <br /> operations unless appropriate rationale or restrictions are provided) <br /> Tank Content: Tank Age: <br /> ❑Combustible Gas/Oxygen Meter. <br /> Other: <br /> ❑Detector Tubes(Specify). <br /> ❑Photo ionization Detector. <br /> 4. Type of Operation:Retail Gasoline Outlet <br /> ❑Organic Vapor Analyzer. <br /> ❑Other,specify. <br /> 5. Release History: <br /> If monitoring instruments are not used,rationale or activity/area restrictions: <br /> Evidence of leaks/soil contamination: ❑YES ❑NO <br /> Documented Groundwater contamination: []YES ❑NO <br /> Background and description of any previous investigation or incidence: <br /> 2. Personal Protective Equipment <br /> Level of Protection: ❑A ❑B ❑C OD <br /> ®Hard Hat. <br /> 6. Potential Health and Safety <br /> ®Safety Glasses/goggles. <br /> Physical Concerns:(check all that apply&describe) <br /> ®Steel toed/shank shoes or boots. <br /> ❑Heat or Cold Stress: °F(high ambient temp.) ❑Flame retardant coveralls. <br /> ❑Noise Sources: <br /> ®Hearing protection. <br /> ❑Oxygen Deficiency: ❑Tyvek. <br /> ❑Excavation:(falls,trips,slipping,cave-ins): <br /> ❑Respirator: [I APR ❑SCBA <br /> ❑Handling and Transfer of a Hazardous Substance:(fire,explosions, A/P cartridge: <br /> ❑ <br /> ®Safety vest. <br /> Confined space entry:(explosions): <br /> ❑ ❑Two-way communication. <br /> Heavy equipment(physical injury&trauma resulting from moving <br /> equipment): <br /> ❑Other,specify PART IV-PLAN APPROVAL <br /> 7. Anticipated Biological Hazards: Plan Prepared by:Ray von Flue Date:1/26/07 <br /> ❑Snakes ❑Insects ❑Rodents ❑Poisonous Plants ,/ <br /> ❑Other/Unknown(specify): Plan Approved by Y2, Date: Z4 <br /> 8. Narrative(provide all information which could impact Health and Safety, <br /> e.g.,power lines,integrity of dikes,terrain,etc.) _ <br /> EH 23081 (02/19/03) <br />