My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LONGE
>
7910
>
2200 - Hazardous Waste Program
>
PR0516115
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2019 11:37:59 AM
Creation date
11/1/2018 11:37:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0516115
PE
2220
FACILITY_ID
FA0012466
FACILITY_NAME
PREMIER FINISHING
STREET_NUMBER
7910
Direction
S
STREET_NAME
LONGE
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
7910 S LONGE
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LONGE\7910\PR0516115\COMPLIANCE INFO 2002 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2002 - 2015
QuestysRecordDate
11/13/2017 7:55:10 PM
QuestysRecordID
3725096
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
562
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Premier Coatings „p <br /> f <br /> Irtc. DBA <br /> � l° >�T>lnrG FORnnar�v�AC����' <br /> Elena Manzo <br /> Environmental Health Department <br /> 1868 E. Hazelton Avenue <br /> Stockton,CA 95205 <br /> Item#303 <br /> Re: Failed to maintain all communication or alarm systems,spill controls or decontamination <br /> equipment. CCR 66262.34(d)(2) <br /> Elena, <br /> I) Floor has been cleaned with acetone and rags. The rags were disposed of as absorbent wipes <br /> with acetone <br /> 2) Empty eyewash station was replenished at the time ofinspection. <br /> 3) Spill kit was ordered and placed by the charging station. <br /> 4) Floor has been cleaned up with acetone and rags. The rags were disposed of as absorbent <br /> wipes with acetone. Secondary containment decks have been ordered and the buckets of <br /> chemical will sit on them. <br /> 4)A check of all communication or alarm systems, spill control equipment,or decontamination <br /> equipment has been added to the weekly facility inspection and documented. <br /> If you have any questions regarding the results please do not hesitate to call me at(209)982-5585. <br /> I certify under penalty of law that this document and all attachments were prepared under my <br /> direction or supervision in accordance with a system designed to assure that qualified personnel <br /> properly gather and evaluate the information submitted. Based on my inquiry a/the person or <br /> persons who manage the system, or those persons directly responsible for gathering the information, <br /> the information submitted is, to the best of my knowledge and belief, true and accurate, and complete. <br /> I am aware that there are significant penalties for submitting false information, including the <br /> possibility offine and imprisonment for knowing violations. <br /> Thank <br /> Tom Wise <br /> Safety &Environmental <br /> P:1PF_Safety& Env ironmental\Enviro-\Environmental Corrections <br />
The URL can be used to link to this page
Your browser does not support the video tag.