My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2200 - Hazardous Waste Program
>
PR0220082
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 2:12:46 PM
Creation date
11/1/2018 12:04:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220082
PE
2220
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\L\LOUISE\500\PR0220082\COMPLIANCE INFO 1989 - 1992.PDF
QuestysFileName
COMPLIANCE INFO 1989 - 1992
QuestysRecordDate
9/22/2017 9:10:01 PM
QuestysRecordID
3256138
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
954
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® - x Document Number: 909 R 5003 <br /> PILKINGTON <br /> Procedure : r ,' Rev: 5Dater 5/241 <br /> b 07 <br /> EMERGENCY RESPONSE PROCEDURES <br /> • Work Instruction .909 1 5001, Collection and Handling of Oily.Wastes, <br /> describes.the proper method for handling Used Oil. <br /> :. Chemical Releases From-Rail Cars <br /> Pilkington receives a number..of dry, raw materials via-rail car. The materials are <br /> caustic in nature and quite fine. Releases are to be addressed by: x, d <br /> • wearing appropriate PPF-.` ... k x <br /> • use a water mist to control dusty :M <br /> + shovel and/or use vacuum to put into alternative container <br /> . ,,: , ., is�} 4; ,. .�, , ,. . �, �'.� a"a� :-� �::."`;aa�;�'. +,°.�;.•'�_;�.' <br /> If the release is a direct response toAhe overturning of' <br /> a rail car, then Union Pacific should.be notified (800- <br /> 272-8777). • r <br /> The rail spur used by Pilkington also serves Carpenter. I a° Wim.== '° _ �a <br /> .:X31 3 T' <br /> Carpenter receives several solvent type materials via rail <br /> tank cars. On occasion, a tank car may actual be stored on the spur within the <br /> Pilkington gates. <br /> .s Tank.Cars waiting for unloading at <br /> Carpenter y . <br /> Procedures for Rail Tank Car Releases <br /> • employees and/or Contractors who notice a release or threaten release <br /> from tanker must immediately notify security. <br /> • under no condition should any Pilkington employee and/or Contractor <br /> respond to a release from any tanker. <br /> • security should request assistance (call 91 1 ) from the local fire <br /> A <br /> department <br /> • security must notify the management incident command team <br /> • upon consultation with the IC team, an evacuation of the facility may be <br /> required. <br /> 909RS003 Rev. 5/.20/04 , .-. <br />
The URL can be used to link to this page
Your browser does not support the video tag.