Laserfiche WebLink
i • <br />SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br />304 E. Weber Ave., Third Floor • Stockton, CA 95202-2708 • Phone (209) 468-3420 <br />Donna Heran, RF-H.S., Director <br />ENVIRONMENTAL HEALTH <br />.SAN JOAQUIN COUNTY. CERTIFIED UNIFIED PROGRAM AGENCY <br />PERMIT TO OPERATE <br />Program Pemnt Permit <br />Record ID Number Program Code and Description - Valid <br />PT0009779 2220 - SMALL QUANTITY HAZARDOUS WASTE GENERATOR FACILITY 1/1/2006 To <br />In order to maintain the permit to operate, Hazardous Waste Generators shall comply with California Health and Safety Code, Div. 20; Chap. 6.5, Art. 2-13, <br />Sec. 25100 at seq;_and Title 22, California Code of Regulations, Chap_20_ _ __-_________________- <br />---- - ------ ---- -----"-- ------ --------------------------------------------------—'------------------ <br />---------------------------------- <br />---- - -------- <br />PR0231656 2300 - UNDERGROUND STORAGE TANK FACILITY 1/1/2006 To, 12/31/2006 <br />Underground Storage Tank Program: <br />California Health and Safety Code, Div. 20, Chap. 6.7 and Title 23, California Code of, Regulations, Chap, i 6. _ _ _ _ <br />----- -------- ----------------- - ----- --------- ------- <br />2360 2 390002316560165602 PT0003889 12,000 REGULAR UNLEADED Active, billable DOUBLE WALLED Coranuais Interstitial Monitoring <br />2360 3 390002316560165603 PT0003890 12,000 PREMIUM UNLEADED Active, billable DOUBLE WALLED Continuous Interstitial Monitoring <br />IMKOM,44-041465,_11 <br />Underground Storage Tank Permit Conditions <br />1) The Permit to Operate will become void if Annual Permit Fees and Service Fees we not paid and/or the UST system(s) fails to remain in compliance with these Permit Conditions. <br />2) In order to maintain the operating permit, the owner and operator shall comply with the H&S Code, Div. 20, Chap. 6.7 and 6:75; and CCR, Title 23, Chap. 16 and 18, as well a5 goy conditions <br />established by San Joaquin County. <br />3) If the Tank operators) is different from the Tank Owner, or if the Permit to Operate is issued to a person other than the owner or operator of the tank, the Permittee shall ensure that both <br />the Tank Owner and tank Operator receive a copy of the permit. <br />4) Written Monitoring Procedures and an Emergency Response Plan must be approved by the Environmental Health Department (EHD) and are considererd UST Permit Conditions. The approved <br />monitoring, response, and plot plans shall be maintained onsite with the Permit. <br />5) The Pennine shag comply with the monitoring procedures referenced in this permit. - <br />6) The Perninee shall 'perform testing and preventive maintenance on all leak detection monitoring equipment actually, or more frequently if specified by the equipment manufacturer, and <br />provide documentation of such servicing to this office. <br />7) In the event of a spill, leak,. or other unauthorind release, the Permitee shall comply with the requirements of Tide 23 CCR, Chap. 16, Art. 5, and the approved Emergency Response Plan. <br />8). written records of all monitoring performed shall be maintained on-site by the operator and be available for inspection for a period of at least three years from the date the monitoring was <br />performed. <br />4) The EHD shag be notified of any change in ownership or operation of the UST system within 30days of such change. - <br />16) Upon any change in equipment, design or operation of the UST system (including change in tank contents or usage), the Permit to Operate will be subject to review, modification or <br />revocation- - <br />- 11) Construction, repair miller removal permits are required from the EHD prior to any change, repair or removal of UST system equipment. <br />12) The Pennines, shall submit an anust report documenting compliance with the UST Permit Conditions within 30 days of the date of the issuance of this permit. <br />13) This Permit to Operate shall not be consideredpermissionto violate any law;, ordinances or statutes of my other Federal, State or Local agency. <br />14) A "Conditional" Permit may be revoked if corrections specified on the inspection report are not completed by the date(s) indicated. <br />PERMITS TO OPERATE are NOT TRANSFERABLE <br />and may SUSPENDED or REVOKED for cause. <br />PERMIT(s) Valid only for: EIP WEST COAST PRODUCTS LLC <br />Tank Owner: EIP WEST COAST PRODUCERS LLC <br />I THIS FORM MUST BE DISPLAYED CONSPICUOUSLY ON THE PREMISES <br />Regulated Facility: ARCO STATION #6080' <br />85 E LOUISE AVE <br />LATHROP CA 95330 <br />Billing Address: ATTN : BP WEST COAST PROD <br />BP WEST COAST PRODUCTS LLC <br />PO BOX 6038 <br />ARTESIA- CA 90702 <br />7023.rp1 <br />Facility ID FA0003635 <br />Account ID AR0003213 <br />Issued 2/3/2006 <br />