Laserfiche WebLink
' Volume calculation: The tank has integral secondary containment with <br /> continuous monitor of the interstice. The piping is in doors under roof over a <br /> sealed concrete slab foundation. The waste transfer line is blown dry at the end <br /> of each transfer operation. The line volume is 6 gallons. If the entire line drained <br /> on to the floor it would form a spill 10' diameter and 1f$" deep. The garage has <br /> sufficient materials to contain and clean the spill if it should happen. <br /> SDesign of containment area: <br /> The tank is a Lube Cube manufactured by Containment Solutions. These tanks <br /> normally have a UL 142 placard on them but it is missing on this tank. The tank <br /> has integral secondary containment which is dry and clean. The transfer piping is <br /> ' welded copper which is inspected daily during business hours. The piping is <br /> indoors, above ground and over a sealed concrete floor. The tank has a <br /> continuous interstice monitor and overfill alarm sensor set at 90% of the tank <br /> ' volume. These points are alarmed by a visual and audible alarm in the garage. <br /> Site Security: The transfer lines and tank are indoors and access is locked during <br /> non-business hours. The dealership is regularly patrolled by the Tracy Police <br /> Department. <br /> Secondary Containment findings: The secondary containment system ' f <br /> sufficient capacity and condition for the containment of releases from all t n s <br /> ' and ancillary equipment. Initials: <br /> 1 <br /> Tracy Chrysler Jeep 13 Waste Anti-freeze Tank <br />