Laserfiche WebLink
Stacy Rivera [EH] <br /> From: Rebecca Lee[rebecca.lee@yara.comj <br /> Sent: Monday, July 14, 2014 5:34 AM <br /> To: Stacy Rivera [EH] <br /> Subject: Process for rinsate tank <br /> Attachments: Stockton facility environmental compliance drawing.docx <br /> Ed <br /> Stockton facility <br /> environmenta... <br /> Ms. Rivera, <br /> I appreciate you speaking with me on Monday, July 7th regarding our response letter from <br /> the inspection completed on May 6th, 2014. After review of our processes, Yara strongly <br /> feels that we have not shipped any oil to our recycler, but understand your concerns. To <br /> insure we do not have any issues in the future with the inspections, we have changed our <br /> process by adding absorbents to all of our storm drains which would come in contact with <br /> vehicles entering our facility. I have attached a drawing of equipment to be utilized at <br /> the drainage locations in our facility. I have also provided links for the absorbent <br /> materials to be used that are listed in the drawing. <br /> Links to absorbent materials to be used: <br /> http://www.newpig.com/pig/US/pig-drain-insert-plus-flt116 <br /> These will go into all round drains. 5 total <br /> http://www.newpig.com/pig/US/patch-repair-maintenance-7240/sediment-debris-air- <br /> filtration-7711/filtrexx-filtersoxx-filterpillows-7794/0/20 <br /> These will go inside Wastewater tank and one inside the sump <br /> http://www.newpig.com/pig/US/pig-drive-over-drainblocker-modular-drain-cover-plr340? <br /> cm cat=shop_by_product# <http://www.newpig.com/pig/US/pig-drive-over-drainblocker-modular- <br /> drain-cover-plr340?cm_cat=shop_by_product> <br /> This will get custom fit along the long drain (84 ft. total length) between loadstands <br /> (highlighted as smaller blue rectangular boxes on drawing) <br /> The absorbents will be inspected on a monthly schedule (in the interim until an <br /> established schedule can be determined) and changed out when spent. The absorbents will <br /> be disposed of properly through a waste oil handler, if needed. <br /> If this information meets the needs of your department regarding management of this <br /> product water, please let me know if this inspection can be closed. <br /> Thank you, <br /> Rebecca Lee <br /> HESQ Manager <br /> Yara North America, Inc. <br /> 100 North Tampa St. , Suite 3200 <br /> Tampa, FL 33602 <br /> rebecca.lee@yara.com <mailto:rebecca.lee@yara.com> <br /> +1 (813) 222-5741 Office <br /> +1 (813) 508-8014 Cell <br /> Cid:imageOOI.png@01CF9B92.OABIAAEO <br /> 1 <br />