Laserfiche WebLink
i 0 RECEIVED <br />CONSOLIDATED CONTINGENCY PLAN OCT 2 9 2014 <br />• <br />Notify the California DTSC, the local CUPA, and the local fire department's hazardous materials program <br />that the facility is in compliance with requirements above. <br />Additional Emergency Response Functions (If Applicable) <br />Emergency Response FunctionResponsible Party's Name orJob Title <br />Post -Incident Reporting/Recording Requirements <br />The time, date, and details of any hazardous materials incident that requires implementation of this plan shall be <br />noted in the facility's operating record. <br />Within 15 days of any hazardous materials emergency incident or threatened hazardous materials emergency <br />incident that triggers implementation of this plan, a written Emergency Incident Report, including, a description of <br />the incident and the facility's response to the incident, must be submitted to the California DTSC, the local CUPA, <br />and the local fire department's hazardous materials program. The report shall include: <br />• Name, address, and telephone number of the facility's owner/operator <br />• Name, address, and telephone number of the facility <br />• Date, time, and type of incident (e.g., fire, explosion, etc.) <br />• Name and quantity of material(s) involved <br />• The extent of injuries, if any <br />• An assessment of actual or potential hazards to human health or the environment <br />• Estimated quantity and disposition of recovered material that resulted from the incident <br />• Cause(es) of the incident <br />• Actions taken in response to the incident <br />• Administrative or engineering controls designed to prevent such incidents in the future <br />Shell Oil Products US —Stockton Terminal <br />H-EALTH <br />`T <br />