Laserfiche WebLink
March 1, 1996 to <br />Page 3 <br />40 <br />;vapor extraction system is being installed and should begin operation during first quarter <br />1996. Operation of this remedial system will address any residual hydrocarbons from the <br />recent release that may not have been recovered by the emergency responses discussed <br />above. Therefore, no additional actions beyond operation of the remedial system are <br />recommended in response to this recent release. <br />31513 5 3 AISPILL.DOC <br />