Laserfiche WebLink
Shell Oil Company -3- 23 March 1992 <br />Stockton Facility <br />SUMMARY <br />Overall the facility is clean and well --maintained. Nevertheless, the following <br />items need to be addressed: <br />1. Some sections of the northern, eastern, and western berms need repair. <br />2. Visual inspection of storm water in the containment area prior to discharge to <br />land is inadequate to protect ground water or surface water quality. At a <br />minimum, the storm water must be tested using EPA Method 602 prior to dis- <br />charge. <br />3. Items 5, 8, 26, 29, 30, 33 through 37, 50, and 52. <br />Phis l� ip'S._sorena� 9 Area Engineer <br />P <br />