Laserfiche WebLink
Hazardous Waste Tank System October <br /> Final Written Assessment per CCR Title 22 <br /> Jiffy Lube Store#598, 1130 North Main Street, Manteca, CA 95336 2017 <br /> cat-cups forum a i d a n c e <br /> Title 22,66265.192(kx I)--A drawing of the tank(s)configuration as well as ✓ <br /> description of the materials of construction and gross capacity is included <br /> (kx2)—Design standards,if available,for the tanks and ancillary equipment,as <br /> well as the following: <br /> (A)—The material of construction <br /> (B)—The material thickness and method used to determine the thickness �C <br /> (C)--Description of tank system piping(material,diameter) <br /> (D)-Description of any internal and external pumps r <br /> (E)--sketch of drawing of tank(s)including dimensions <br /> (k)(3)--Documentcd(or estimated,if unknown)age of the tank system- <br /> (k)(4)--Dcscription and evaluation of any leak detection equipment <br /> (Not applicable if the tank system and associated piping is to be inspected <br /> daily for leaks and corrosion) 1 <br /> (kx5)~Description and evaluation of any corrosion protection <br /> equipment,devices of materials rr <br /> (k)(6)--Description and evaluation of any spill prevention or overfill equipment <br /> (k)(7)--Description and evaluation of the secondary containment <br /> for the tank system(including ancillary equipment)6 <br /> (k)(8)--Hazardous waste characteristics of the waste(s)that have ✓ <br /> been or will be handled is included <br /> (k)(9)--Independent,qualified professional engineer's inspection of the system <br /> for the following; <br /> (A)Weld cracks or breaks <br /> (B)Scrapes of protective coatings ✓ <br /> (C)Corrosion t� <br /> (D)Any structural damage or inadequacy construction or <br /> installation cracks,punctures damaged fittings. All discrepancies shall <br /> be documented in the assessment and remedied before <br /> the tank system is placed in use <br /> k(10)--Ali new tanks and ancillary equipment shall be tested for <br /> tightness prior to being placed in use.The results of the test(s)shall be <br /> documented in this assessment <br /> k(1 I)--Estimated remaining service life of the tank system based on yr <br /> findings of subsections k(I)through k(10) <br /> Strandberg Associates 1(866) 388-0404 rwaterguyQrwaterguy.corn 23 <br />