My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
820
>
2900 - Site Mitigation Program
>
PR0536718
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 7:14:07 PM
Creation date
11/1/2018 2:52:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536718
PE
2960
FACILITY_ID
FA0021094
FACILITY_NAME
FORMER SIEBOLD CONSTRUCTION
STREET_NUMBER
820
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14729211
CURRENT_STATUS
01
SITE_LOCATION
820 S AMERICAN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> P <br /> age <br /> 1.0 Introduction.................................................................................................................................. 1 <br /> 1.1 Objective............................................................... <br /> ......I...................... 1 <br /> 1.2 Site Description............................................................................................................... 1 <br /> 1.3 Site History...................................................................................................................... 1 <br /> 2.0 Site geology and hydrogeology................................................................................................... 3 <br /> 3.0 Proposed Tasks ...................... ..... ............................................................................................. 3 <br /> 3.1 Pre-Field Activities .......................................................................................................... 3 <br /> 3.2 Drilling and Monitoring Well Installation .......................................................................... 3 <br /> 3.3 Soil and Groundwater Sampling and Analysis ................................................................ 4 <br /> 3.4 Monitoring Well Development......................................................................................... 4 <br /> 3.5 Groundwater Monitoring Well Survey.............................................................................. 5 <br /> 3.6 Quarterly Groundwater Monitoring, Sampling, and Reporting......................................... 5 <br /> 3.7 Investigation Derived Residuals...................................................................................... 5 <br /> 4.0 Report Preparation................ . . ....... . . ... . ..... ........ .......... ..................................................... 5 <br /> 4.1 Quality Assurance/ Quality Control ................................................................................ 5 <br /> 5.0 Site-Specific Safety Plan............................................................................................................. 5 <br /> 6.0 Anticipated Schedule................................................................................................................... 5 <br /> 7.0 Distribution .................................................................................................................................. 6 <br /> Attachments: <br /> Figures <br /> Figure 1 —Vicinity Map <br /> Figure 2— Proposed Monitoring Well Location Map <br /> Figure 3 — Proposed Monitoring Well Construction Details <br /> Appendices <br /> Appendix A—Standard Operating Procedures <br /> Appendix B—Site-Specific Safety Plan <br /> 03009-10017-37110 i of March 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.