My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
820
>
2900 - Site Mitigation Program
>
PR0536718
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 7:14:07 PM
Creation date
11/1/2018 2:52:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536718
PE
2960
FACILITY_ID
FA0021094
FACILITY_NAME
FORMER SIEBOLD CONSTRUCTION
STREET_NUMBER
820
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14729211
CURRENT_STATUS
01
SITE_LOCATION
820 S AMERICAN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
soil sample. <br /> A clean set of En Core® samplers, soil sleeve, glass jar, or plastic syringe will then <br /> be driven into the soil pile until each are completely full or contain the correct <br /> amount of soil as detailed above. <br /> • The sample handling, field screening and documentation as referenced for soil <br /> sampling above, will be followed. <br /> General Site Activities <br /> The field staff person shall: <br /> • Describe the lithology observed on each sidewall and the bottom of the excavation, or <br /> the soil encountered every five feet in a boring, using the Unified Soils Classification <br /> System(USCS)or the American Society of Testing and materials (ASTM) Method <br /> D2488, and a Munsell Soil Color Chart. <br /> Measure the length, width,and depth of the excavation or the dimensions of the <br /> stockpile and any notable features, with reference to permanent structures at the site. <br /> • Take photographs of the proceedings and of the site upon arrival, during activities, <br /> and upon departure, for additional documentation. <br /> • Retain a copy of the chain-of-custody upon submittal of the samples to the laboratory, <br /> for documentation. <br /> • Additional documentation shall include: <br /> — Measurements of the USTs removed (length, diameter) <br /> — Visual observations of the condition of the UST(s) <br /> — Photographs of the UST or excavation <br /> — Disposition of waste generated <br /> — Name and association of all parties at the site during the activities <br /> — Other items deemed relevant <br /> 5. Equipment Required <br /> Organic Vapor Analyzer(PID or FID), calibrated and ready for use <br /> • Disposable sampling gloves <br /> • Decontamination supplies <br /> Soil sampling equipment(shovel, hand trowel, knife, etc.) <br /> • Measuring tape <br /> • Ziploc baggies <br /> • Indelible marker <br /> • Soil sampling containers and labels <br /> • Chain-of-custody forms <br /> • Ice chest and ice <br /> • Camera <br /> SOP Soil Sampling for 5035 VOCs 4 of$ <br /> August 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.