My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ANDERSON
>
925
>
2900 - Site Mitigation Program
>
PR0517512
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 8:52:12 PM
Creation date
11/1/2018 3:15:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0517512
PE
2960
FACILITY_ID
FA0013476
FACILITY_NAME
FTG CONSTRUCTION MATERIALS, INC
STREET_NUMBER
925
Direction
W
STREET_NAME
ANDERSON
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
925 W ANDERSON ST
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUND ZERO ANALYSIS, INC. Quality Control/Quality Assurance Plan <br />methods to be utilized for purgeable and semivolatile hydrocarbons analyses are shown on Table <br />2. <br />9.0 GROUNDWATER MONITORING PROTOCOL <br />Monitoring of depth to water and free phase LNAPL (light non -aqueous phase liquids) thickness <br />within wells will be conducted using an interface probe or conductivity meter. For consistency, <br />all measurements will be taken from the north side of the wellhead at the survey mark. To <br />assess potential infiltration of fine grained sediments, total well depth will also be sounded. <br />Thickness of LNAPL on the groundwater surface is calculated by subtracting the depth to <br />product from the depth to water. In addition, water elevations are adjusted for the presence of <br />fuel with the following calculation: <br />(LNAPL Thickness)(specific gravity) + (Water Elevation)= Corrected Water Elevation <br />Newly installed wells will be allowed to stabilize for 24 hours after development prior to free <br />phase thickness determination. <br />An acrylic Surface Sampler will be used for visual inspection of the groundwater in order to note <br />sheen (difficult to detect with the Interface Probe), odors, microbial action and sediments. The <br />sampler is calibrated in inches and centimeters for visual inspection of product thickness. <br />To reduce the potential for cross contamination between wells, the monitoring will take place in <br />order from the least to most contaminated, if known. Well containing free product will be <br />monitored last. Between each well monitoring the equipment will be decontaminated. <br />Water level data collected from the wells will be used to develop a groundwater contour map for <br />the project site. Groundwater flow will be estimated to be perpendicular to equipotential lines <br />drawn on the map. <br />10.0 WELL DEVELOPMENT PROTOCOL <br />Groundwater monitoring wells will be surged and developed prior to sampling activities. <br />Approximately 10 times the volume of water in the casing will be withdrawn if possible. <br />If the aquifer is slow to recharge, development will continue until recharge is too slow to <br />practically continue. The volume of water produced versus time will be recorded. All purged <br />groundwater will be stored on-site in 55 gallon waste drums unless permission is granted by the <br />appropriate regulatory agency to discharge the water to the ground surface or sanitary sewer. <br />Drummed water will be labeled with the source of the water to help ensure appropriate disposal <br />based on contamination levels. <br />G AGROUNDZE\QAQC\QAQC. doc <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.