Laserfiche WebLink
Ground Zero Analysis, Inc. <br />SITE SAFETY PLAN <br />Physical Hazards <br />Task(s) <br />Hazard <br />Mitigation Measure <br />1 <br />Heavy Equipment (Noise & Physical <br />All heavy equipment used on this project will be in <br />contact) <br />good working order and operated in accordance <br />with recognized industry standards and Cal -OSHA <br />Title S, Subchapter 4, Construction Safety Orders. <br />All equipment operators and ground crews <br />working in close proximity of heavy equipment will <br />be supplied with ear protection. <br />1 <br />Dust <br />The dust hazard will be mitigated by not allowing <br />ground crew to be located down wind of <br />excavation activity. In addition, water will be <br />applied to control the dust if visible levels of dust <br />are generated. <br />Fire and Explosion Hazards <br />List Flammable or Combustible materials on-site. Keep sources of ignition away from these materials. <br />Flammable (Flash Point <100 °F) <br />Combustible (Flash Point <200 °F) <br />Gasoline <br />Diesel <br />Type and Location of Fire Extinguishers (Show on map for large projects) <br />Dry chemical fire extinguishers Class A B and C are stored in all GZA vehicles. <br />PAGE <br />