My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 2008 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:28:18 PM
Creation date
11/1/2018 3:47:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2008 - 2012
FileName_PostFix
2008 - 2012
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/04/2009 16: 25 6613933523 CHUCK HILL PAGE 021'16 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans& applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES M7 NO C <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> "Site Health and Safety <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the <br /> Plan" is available on the Jobsite as required by Title 8, <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs andlor replacements. If repairing a component, describe <br /> e the UST nhow stall will <br /> lln be <br /> done, <br /> (If <br /> ddin piping, UDC's, or other UST equipment, or performing tank top upg <br /> on <br /> pages 4-8 as necessary for a timely plan review): r <br /> e,7 <br /> 6-15 <br /> 7 <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> A <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.