Laserfiche WebLink
Spill Bucket Testing Report Form <br />r�v� <br />err Awa <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: Valley ARCO Date of Testing: 04/29/2009 <br />Facility Address: 16 E. Harding Way <br />Facility Contact: Abraham Phone: (209) 466-9515 <br />Date Local Agency Was Notified of Testing: <br />Name of Local Agency Inspector (if present during testing): N/A <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: EPIC Compliance Systems, Inc. <br />Technician Conducting Test: Keith Huston <br />Credentials: R1 CSLB Contractor ❑ ICC Service Tech. ❑ SWRCB Tank Tester ❑ Other (Spec) <br />License Number(s): 880430 <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: El Hydrostatic ❑ Vacuum ❑ Other <br />Test Equipment Used: 1 Hour LAKE Test <br />Equipment Resolution: <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc.) <br />1 Regular <br />2 Regular <br />3 Premium <br />4 Mid -Grade <br />Bucket Installation Type: <br />❑ Direct Bury <br />i] Contained in Sum <br />❑ Direct Bury <br />D Contained in Sum <br />❑ Direct Bury <br />❑x Contained in Sump <br />❑ Direct Bury <br />❑x Contained in Sum <br />Bucket Diameter: <br />12" <br />12" <br />12" <br />12" <br />Bucket Depth: <br />14" <br />14" <br />14" <br />14" <br />Wait time between applying <br />vacuum/water and start of test: <br />5 minutes <br />5 minutes <br />5 minutes <br />5 minutes <br />Test Start Time (Ti): <br />4:40 PM <br />4:40 PM <br />4:40 PM <br />4:40 PM <br />Initial Reading (Rt): <br />13 1/4" <br />13" <br />13 1/8" <br />12 5/8" <br />Test End Time (TF): <br />5:40 PM <br />5:40 PM <br />5:40 PM <br />5:40 PM <br />Final Reading (RF): <br />11 1/2" <br />11 3/4" <br />13 1/8" <br />12 5/8" <br />Test Duration (TF —T,): <br />1 hour <br />1 hour <br />1 hour <br />1 hour <br />Change in Reading (RF - Ri): <br />1 3/4" <br />1 t/4" <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />1/16" hr. <br />1/16"hr. <br />1/16"hr. <br />1/16"hr. <br />Test Result: <br />❑ Pass OO Fail <br />❑ Pass OO Fail <br />0 Pass ❑ Fail <br />❑x Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Spill buckets for regular fill sump leaked into fill sump set off sensor and shut down station. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: <br />Date: 04/29/2009 <br />t State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />