My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 2008 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:28:18 PM
Creation date
11/1/2018 3:47:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2008 - 2012
FileName_PostFix
2008 - 2012
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VM1 <br />Vaporless Manufacturing, Inc. <br />Quality Petroleum Equipment <br />Solutions for Over 20 Years <br />LDT- 890 Test Form & VMI Warranty Checklist <br />October I , 2006 <br />Test Information . <br />Date: 04/29/2009 Test Company: _EPIC Compliance Systems, Inc. <br />Telephone: (209) 466-9515 Contact: Abraham <br />Site I.D: Valley ARCO Address: 16 E. Harding Way <br />City: Stockton State: CA Zip: 95204 <br />Type of Test Equipment: LDT-890 <br />.Submersible Pump Identification <br />MFG: Red Jacket Model No: P20OT20-24 Serial No: 1832 <br />Leak Detector Identification <br />MFG: Red Jacket PLLD Model No: 244-006-5 Serial No: 00823 <br />Replacement Leak Detector Identification: <br />MFG: Model No: Serial No: <br />Line Conditions: <br />1. Type of Pipe: FG 2. Diameter of Pipe: 2" 3. Length of Pipe: 150ft. <br />4. Burial Depth of Leak Detector: 12" 5. Kind of Fuel: 91 6. Date of Last Line Test: ---- <br />Test Conditions: <br />1. Operating Pump Pressure: 29 2. Gallon per hour test rate: 3 @ 10 psi <br />3. Static Line Pressure (Pump Off): 20 4. Bleedback Test (Pump Off): 150 ml. <br />5. Step -through time to full flow N/A seconds (0 psi. to full pump pressure, no leak) <br />6. Leak detector stays in Leak Search Position with a 3 GPH leak - Yes: N/A PASS No: FAIL <br />7. Was the leak detector adjusted — Yes: No: X PLLD shut the line down when it <br />detected a 3 g.p.h. leak. <br />Symptoms <br />1. Won't find 3 GPH leak: <br />3. Other: <br />2. Stays in Slow Flow: <br />************ If This Unit Is Returned Under Warranty Please Complete The Following *********** <br />Vaporless RGA#: <br />Telephone: <br />Customer Control #: <br />City: <br />Return By (Company): <br />Contact: <br />Address: <br />State: <br />(See Website - .www.vaporless.com. - Technical Bulletin 032805) <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.