c <br />Spill Bucket Testing Report Form 0////r <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (af applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: Valley Arco Date of Testing: 05/07/08 <br />Facility Address: 16 E Harding Way, Stockton, CA, 95204 <br />Facility Contact: Paul I Phone: (209) 606-3551 <br />Date Local Agency Was Notified of Testing : 04/29/08 <br />Name of Local Agency Inspector (rf present during testing): Garrett Backus <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: EPIC Compliance Systems, Inc. <br />Technician Conducting Test: Alvin L. Milburn <br />Credentials 0 CSLB Contractor l] ICC Service Tech. ❑ SWRCB Tank Tester ❑ Other (Spec) <br />License Number(s): 880430 <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: 91 Hydrostatic ❑ Vacuum ❑ Other <br />Test Equipment Used: Caldwell <br />Equipment Resolution: .0025" <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc. <br />1 <br />87 E <br />2 <br />87 W <br />3 <br />89 <br />4 <br />81 <br />Bucket Installation Type: <br />❑ Direct Bury <br />0 Contained in Sump <br />❑ Direct Bury <br />x❑ Contained in Sump <br />❑ Direct Bury <br />0 Contained in Sump <br />❑ Direct Bury <br />❑x Contained in Sump <br />Bucket Diameter: <br />12" <br />12" <br />12" <br />12" <br />Bucket Depth: <br />14" <br />14" <br />14" <br />14" <br />Wait time between applying <br />vacuum/water and start of test: <br />5min <br />5min <br />5min <br />S m i n <br />Test Start Time (TI): <br />13:00 <br />13:00 <br />13:00 <br />13:00 <br />Initial Reading (111): <br />12" <br />0 <br />0 <br />0 <br />Test End Time (TF): <br />14:00 <br />Final Reading (RF): <br />12" <br />Test Duration (TF — T[): <br />1 hr <br />Change in Reading (RF -RI): <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />0 <br />0 <br />Test Result: <br />El Pass ❑ Fail <br />❑ Pass El Fail <br />❑ Pass El Fail <br />❑Pass ❑O Fail <br />Comments — (include information on repairs made prior to testing, and recommended %ollow-up for ailed tests) <br />The tops of the 3 failed spill bucket fill swivel adapters are damaged and don't make a good seal with <br />the dust caps. New adapters and caps should be installed. <br />The 87 fills are OPW duals in one containment sump. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />or <br />Technician's Signature: � " — Date: 05/07/08 <br />State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />