Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PEPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> 11 Other(Sped) <br /> Test Equipment Used: Equipment Resolution: <br /> Sump # Sump# Sump# Sump# <br /> Sump Diameter: r " <br /> Sump Depth: <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> ! Portion of Sump Tested' <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ❑NA F.Yes _'No i 1 NA . :Yes ❑No ❑NA ❑Yes ❑No F NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> shutdown?` <br /> Was fail-safe verified to be ❑yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R[): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: ❑ Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass [] Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testings ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to Any of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />