Laserfiche WebLink
L <br /> United States Postal ServiceY Stockton Vicle Maintenance Facili <br /> ty <br /> during this evaluation:-maybe present in soil and ground water at the site. Our <br /> sampling and analytical plan ova' designed.using accepted environmental .principles <br /> and our judgment for the performance of a soil quality evaluation and was based on <br /> the degree of investigation approved by you. It is possible to obtain a greater degree <br /> of certainty, if desired, by implementing a more rigorous soil and ground water <br /> sampling program-.or evaluating the risk posed by the contaminants detected, if any. <br /> 6.0 REFERENCES <br /> URS Greiner Woodward CIyde. July 27, 1999. Construction Observation Report, USPS <br /> . Stockton VMF, 3131 Arch Road, 'Stockton, California. <br /> Ramcon. August. 26, 1999. Summary Report; .Underground Oil Tank Removals, <br /> Vehicle.Maintenance Facility, 3131 Arch-Airport Road, Stockton, California <br /> ! <br /> L <br /> EIS ' <br /> L' <br /> I <br />! L <br />€E <br /> 4 S <br /> WWWYASSOCIA-ES Page 5 <br /> Environmental!Geotechnical!Engineering Services 864-76 <br />