My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2200 - Hazardous Waste Program
>
PR0514089
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2022 2:43:26 PM
Creation date
11/1/2018 4:24:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514089
PE
2247
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\P\PICCOLI\1990\PR0514089\RTC 4_18_08 INSPECTION\RTC 4_18_08 INSPECTION.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNYDER INDUSTRIES INC. <br />TANK RESTRAINT CALCULATIONS -SEISMIC & WIND ANALYSIS <br />PROJECT NAME SNYDER INDUSTRIES INC. <br />WIND DESIGN CRITERIA: <br />Design is per ASCE 7-05 Section 6.5.15 <br />WIND SHEAR: F = q,.GCrAr <br />RECEIVEC <br />DATE 5/18/2011 <br />BY TAM JUL 2 8 2014 <br />JOB# E10-071 <br />ENVIRONMENTAL HEALTI- <br />DEPARTMENT <br />DESIGN WIND SPEED = <br />Where: qZ= .00256KZKZtKdV21 = 53.49 PSF [<15', Exp C] <br />G = 0.80 <br />Cr = 0.80 <br />Ar = 4.41 FT <br />KZ = 0.85 <br />KZt = 1.0 <br />F = 151 LBS. Kd= 0.95 <br />1= 1.,15 <br />A. = uainht of nrimery tank * diameter of containment tank <br />150 MPH <br />Section 6.5.15 <br />Section 6.5.10 <br />Section 6.5.8 <br />Figure 6-21 <br />Table <br />6-3 <br />Section <br />6.5.7.2 <br />Table <br />6.4 <br />Table <br />6-1 <br />V <br />WIND <br />DESIGN <br />CABLE DESIGN <br />- see below <br />CABLE <br />CONTAIN PRIMARY TANK <br />TANK TANK DIAM TANK TANK WT <br />Mot (FT- <br />DL Mr <br />Req'd Mc <br />MODEL # MODEL # (FT) HT (FT) (LBS) <br />F (LBS) <br />LBS) <br />(FT -LBS) <br />(FT -LBS)- <br />He FT Ph LBS <br />100020ON <br />1000101N <br />1.58 <br />2.79 <br />50 <br />151 <br />211 <br />53 <br />158 2.0 79 <br />NOTES: Wind shear calculated based on pressure noted above multiplied by the surface area of The tank (height * diameter). <br />The wind force Is applied at midheight to calculate the overturning moment. The resisting moment Is based on <br />the empty weight of the tank acting act the centerline of the tank. In all cases, there is net overturning for wind <br />on an empty tank. The tank has been stabilized for this condition by the addition of cable bracing. The cable and <br />anchor forces are determined based on the force required at the top of the cable (Ph In Table above) to stabilize <br />the tank for overturning In wind. In all cases, seismic forces govern for design of base shear anchorages. <br />Note: Where seismic foces govern overturning, the required resisting moment (Mc In table above) <br />corresponds to the net seismic overturning moment. <br />TANK CAP Capacity of primary tank in gallons <br />TANK DIAM Tank diameter of containment tank <br />TANK HT Tank height of inner tank) <br />TANK WT Weight of primary tank+containment tank <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.