Laserfiche WebLink
P = pressure (.433 x S.G. x H), PSI <br />H = fluid head, ft. <br />S. G. = specific gravity, g/cm^3 <br />O.D. = outside diameter, in. <br />9.1.1 The hydrostatic design stress shall be determined by multiplying the hydrostatic <br />design basis, determined by ASTM D2837 using rotationally molded samples, with a service <br />factor selected for the application. The hydrostatic design stress is 600 PSI at 73 degrees <br />Fahrenheit for Type II materials. In accordance with the formula in 7. 1, the tank shall have a <br />stratiform (tapered wall thickness) wall. <br />9.1.2 The hydrostatic design stress shall be derated for service above 100 degrees <br />Fahrenheit and for mechanical loading of the tank. <br />9.1.3 The standard design specific gravity shall be 1.5 or 1.9. <br />9.1 The minimum required wall thickness for the cylinder straight shell must be sufficient to <br />support its own weight in an upright position without any external support. Secondary <br />containment tanks shall be designed per the manufacturer's standard containment thickness <br />requirements. The secondary containment shall be configured to allow shipment of the <br />primary tank inside of the secondary tank. The shipment shall be done without the aid of <br />additional spacer blocks which can be lost during shipment causing tank damage. <br />9.2 The top head must be integrally molded with the cylinder shell. The minimum thickness of <br />the top head shall be equal to the top of the straight wall. The primary tank top shall be <br />configured to prevent rain water from entering the secondary containment tank. The top <br />head of tanks with 550 or more gallons of capacity shall be designed to provide a minimum <br />of 1300 square inches of flat area for fitting locations. The primary tank shall be keyed to the <br />secondary tank preventing primary tank rotation. The secondary containment shall have <br />115% of the normal fill capacity of the primary tank. <br />9.3 Tanks with 550 or more gallons of capacity shall have a minimum of 3 lifting lugs integrally <br />molded into the top head. The lifting lugs shall be designed to allow erection of empty <br />primary and secondary tanks. Tanks shall be capable of being lifted into position as a unit <br />(primary and secondary tanks). <br />9.4 The tank shall be designed to provide a minimum of 4 tie -down lugs integrally molded into <br />the top head. The tie -down lugs shall be designed to allow tank retention in wind and <br />seismic loading situations without tank damage. The primary/secondary tank unit shall be <br />configured to allow direct primary tank base retention for seismic load conditions. The base <br />retention unit shall be anchor bolted to an appropriate structure and not require additional <br />spacer blocks. Refer to section 14.0 for tank tie -down accessories. <br />Table II — Tank Schedule <br />Tank Reference # <br />Quantity <br />Capacity - Side Wall <br />Specific Gravity— designed <br />Primary Tank <br />Secondary Tank <br />JUL 2 8 <br />Diameter nominal <br />Height feet maximum <br />N <br />2014 <br />AL HEALTH <br />TIENT <br />