My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2200 - Hazardous Waste Program
>
PR0514089
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2022 2:43:26 PM
Creation date
11/1/2018 4:24:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514089
PE
2247
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\P\PICCOLI\1990\PR0514089\RTC 4_18_08 INSPECTION\RTC 4_18_08 INSPECTION.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.5.1 All primary tanks 2000 gallons or larger shall be measured for tank wall thickness at <br />6", 1ft., 2ft. and 3ft. on the tank sidewall height at 0° and 1800 around the tank circumference <br />with 00 being the tank manway and going counter -clockwise per ANSI standard drafting <br />specifications. A copy of this test report can be ordered when placing the original tank <br />order. All tanks shall meet design thickness requirements and tolerances. <br />10.5.2 Tanks smaller than 2000 gallons are only periodically measured at the start of a <br />production run or after any design changes. Customers can place an order for tank wall <br />thickness measurements on smaller tank sizes when placing the original order. A copy of <br />the test report will be provided if ordered. <br />10.6 Hydrostatic Water Test <br />10.6.1 The hydrostatic water test shall consist of filling the primary tank to brim full capacity <br />for a minimum of four hours and conducting a visual inspection for leaks. A hydrostatic water <br />test will be conducted if ordered by the customer. <br />10.7 Workmanship <br />10.7.1 The finished tank wall shall be free, as commercially practicable, of visual defects <br />such as foreign inclusions, air bubbles, pinholes, pimples, crazing, cracking and <br />delaminations that will impair the serviceability of the vessel. Fine bubbles are acceptable <br />with Type II tanks to the degree in which they do not interfere with proper fusion of the resin <br />melt. <br />10.7.2 All cut edges where openings are cut into the tanks shall be trimmed smooth. <br />Table III — Fitting and Accessory Schedule <br />Tank Number TNK - TNK - TNK - TNK - <br />Description Quantity /Size Quantity / Size Quantity I Size Quantity / Size <br />Inlet nozzle <br />Top draw outlet nozzle <br />Drain (transition fitting) <br />Overflow <br />Vent <br />Surge Protection Lid <br />Fill <br />External fill pipe <br />Internal fill pipe <br />Manwa <br />Threaded / vented <br />Threaded <br />Hinged <br />Bolted / Sealed <br />Ladder / FRP <br />Galvanized Steel <br />Lifting Lugs <br />Tie -down Lugs <br />Seismic/Wind Tie -down <br />Galvanized Steel <br />304 SS <br />28 2014 <br />4ENTAL HEALTH <br />ARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.