My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2200 - Hazardous Waste Program
>
PR0514089
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2022 2:43:26 PM
Creation date
11/1/2018 4:24:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514089
PE
2247
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\P\PICCOLI\1990\PR0514089\RTC 4_18_08 INSPECTION\RTC 4_18_08 INSPECTION.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17.5 Tank shrink wrapping and bagging is available upon customer request. <br />17.6 All fittings that do not interfere with tank shipment shall be installed unless otherwise <br />specified. Fittings and accessories that interfere with tank shipment or could be broken <br />during shipment are shipped separately. <br />18. Shipping <br />18.1 Since there are variations in methods of shipping, SII's instructions shall be followed in all <br />cases. <br />18.2 Consult the SII "Guidelines for Use and Installation" booklet included with your tank for <br />unloading instructions on specific tanks. This booklet can be found attached to the cap or <br />manway area on the inside of the tank. Tanks with capacities of 2000 gallons or more have <br />molded -in lifting lugs provided to assist with tank handling. All tank units are shipped with <br />shipping cables allowing the two tanks to be handled as a unit during shipping and tank <br />handling. Once the tank is put into position the shipping cables are to be removed to allow <br />the tank to fully contact the tank pad/support area. <br />18.3 Upon arrival at the destination, the purchaser and/or his agent shall be responsible for <br />inspection for damage in transit. If damage has occurred, a claim should be filed with the <br />carrier by the purchaser, and the manufacturer should be notified prior to the tank being put <br />into service. <br />19. Delivery & Storage <br />19.1 Installation <br />19. 1.1 Transportation, handling, storage of the tanks, and installation shall be in accordance with <br />the manufacturer's printed instructions. <br />19.1.2. Repair any damage to tank components or the insulation due to transportation or <br />installation. <br />19.1.3. All tank fitting attachments shall be equipped with flexible couplers or other movement <br />provisions provided by the tank customer. The tank will deflect based upon tank loading, <br />chemical temperature and storage time duration. Tank piping flexible couplers shall be <br />designed to allow 4 percent design movement. Movement shall be considered to occur <br />both outward in tank radius and downward in fitting elevation from the neutral tank fitting <br />placement. <br />19.1.4. The installer is to certify in writing that the tank system has been installed according to the <br />tank manufacturer's Guidelines for Use & Installation. <br />RECEIVED <br />JUL 2 8 2014 <br />ENVIRONME TALHEALTH <br />OEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.