Laserfiche WebLink
------------- <br /> i <br /> Chart no. 1 <br /> Complete Ramp Closure HourslRamp Lane Requirements <br /> County: SJ Route/Direction: 1-5 SB _FP <br /> M:25.203 <br /> Closure limits: SB on ramp from Charter Way to Interstate 5 <br /> From hour to hour 24 1 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 17 18 19 20 21 222324 <br /> Mondays through Thursdays ` S S S S S S <br /> Fridays I S S SSSS <br /> Saturdays <br /> I <br /> Sundays I <br /> Le end: <br /> rS Shoulder closure allowed <br /> Work allowed within the highway where shoulder or lane closure is not required <br /> i <br /> REMARKS: Permit# 1012-6SV-0524 "Valid Through Construction Year 2012" <br /> 09/19!2012 <br /> 1. See Lane Closure Restriction for Designated Legal Holidays and Special Days table in <br /> Maintain Traffic of these special provisions for additional closure restrictions. I <br /> 2. 7-day advance notice required. <br /> 3. No two consecutive or opposing ramps may be closed at the same time. <br /> 4. Closures of local roads will require City/County concurrence. <br /> I <br /> Q�,o�Essro <br /> o <br /> LU No. 77342 `M <br /> Exp.___G A61113 <br />