Laserfiche WebLink
GEOSYNTEc CONSULTANTS <br /> ' Ms. Amy Terrell <br /> 31 January 2005 <br /> Page S <br /> ' Attachments: <br /> Figure 1 Site Location Map <br /> Figure 2 Site Map Showing Compounds in Soil, 1999 Phase II ESA Results <br /> ' Figure 3 Site Map Showing Compounds in Groundwater, 1999 and 2000 Grab <br /> Groundwater Results <br /> Figure 4 1,2-DCP and 1,2,3-TCP in Groundwater (with 1,2-DCP Concentration <br /> ' Contours), 1999 and 2000 Grab Groundwater Results <br /> Figure 5 NH3 and NO3/NO2 in Groundwater and NH3 Contours, 1999 and <br /> 2000 Grab Groundwater Results <br /> ' Figure 6 Proposed Sampling Locations and 1999 and 2000 Direct Push Sample <br /> Locations <br /> ' Groundwater Monitoring Construction Diagram, MW-6 <br /> P:\PRJ2003REM\Wilbur-Ellis\Wt0250(JTF)\STOCKTON\S LX\2005 Source Area Invest\SSI Work Plan.doc <br /> `�, RECYCLED AND RECYCLABLE <br />