My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PORT ROAD 22
>
501
>
2200 - Hazardous Waste Program
>
PR0539246
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:07:15 AM
Creation date
11/1/2018 4:48:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0539246
PE
2220
FACILITY_ID
FA0022433
FACILITY_NAME
CenCal Recycling, LLC
STREET_NUMBER
501
STREET_NAME
PORT ROAD 22
City
Stockton
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
501 PORT ROAD 22
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\P\PORT RD #22\501\PR0539246\COMPLIANCE INFO 2015 - 2016 .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERS Consolidated Emergency Response/Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY(Check all that apply): CIL <br /> 211.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; 3.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY(Check all that apply): C12. <br /> El 1.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; 3.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM; ❑6.PORTABLE <br /> <br /> <br /> <br /> <br /> :If more than one alternate emergency coordinator is designated,attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility's procedures for containing spills and preventing and mitigating releases,fires and/or explosions. <br /> ni <br /> 1. MONITOR FOR LEAKS,RUPTURES,PRESSURE BUILD-UP,ETC.; <br /> ❑2. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e.g.,Portable spill containment walls,built-in berms); <br /> ❑3. PROVIDE ABSORBENT PHYSICAL BARRIERS(e.g.,Pads,spill pigs,spill pillows); <br /> ❑4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> [:15. LINED TRENCH DRAINS AND/OR SUMPS; <br /> [16. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> [17. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> ❑8. STOP PROCESSES AND/OR OPERATIONS; <br /> E:19. AUTOMATIC/ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> ❑ 10.SHUT OFF WATER,GAS,ELECTRICAL UTILITIES; <br /> 11.CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> Q 12.NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> 17113.ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> ❑ 14.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> ❑ 15.REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> 17116.HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> Q <br /> IT USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> ❑ 18.VACUUM SUCTION USING APPROPRIATE VACUUM(e.g.,Intrinsically safe)FOR SPILL CONTROL AND/OR CLEANUP; <br /> 19.DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> ❑20.PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> ❑21.OTHER(Specify): <br /> D2. <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S)WILL BE USED TO BEGIN EVACUATION OF THE FACILITY(Check all that apply): <br /> ❑ 1. BELLS; <br /> ❑2. HORNS/SIRENS; <br /> 3. VERBAL(i.e.,Shouting); <br /> ❑4. OTHER(Specify): <br /> THE FOLLOWING LOCATION(S)WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S)(e.g.,Parking lot,street comer): <br /> SCALE AREA IN FRONT OF OFFICE <br /> Note:The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: Ea <br /> Q 1.WRITTEN PROCEDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑2.EVACUATION MAP(S)DEPICTING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑3. OTHER(Specify): E5. <br /> Note:Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES(Check one of the following): Ft. <br /> F!] 1, HAVE BEEN DETERMINED NOT NECESSARY; <br /> ❑2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE(Specify): F2. <br /> Note:Advance arrangements with local fire and police departments,hospitals,state and local emergency response teams,and/or emergency services <br /> contractors should be made for your facility,if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev.03/07/17 Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.