Laserfiche WebLink
1 <br /> S WPPP Attachment D Page 16 of 17 <br /> WORK SHEET 1 <br /> LIST OF SIGNIFICANT MATERIALS HANDLED AND STORED AT THE SITE <br /> Instructions: List all the materials stored and handled onsite. Evaluate these materials for their potential to contribute pollutants to stormwater <br /> runoff. _ z ,A�r �ue cn , <br /> h'anti z <br /> TD ins; Sio�qe <br /> ��L-wl�S�C " &'AL- oorvin naves <br /> � ( 5sgac. <br /> b;L r,l J�ry rn <br /> FueLG,L'kRcs <br /> U � Ssga� <br /> l7 teseL <br /> UAL l�bso ids <br /> r vj zar-6-1 Less Ilan <br /> �cnd�n� 2a� les 33 aC_ <br /> I ess } ha <br /> -lam <br /> Indicate on the site map where these materials are stored,handled,and disposed.Also indicate if materials are exposed to precipitation or if materials are within the path of <br /> stormwater runoff. <br /> ck�Worksheet 1- Prepared by: hp /� - Date: (17 iD <br /> INDUSTRIAL STORMW ATER NPDES PERMIT <br /> Ij <br /> AND GENERAL WDRs FOR MARINAS <br /> IN THE LAKE TAHOE HYDROLOGIC UNIT <br />