My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
8203
>
2200 - Hazardous Waste Program
>
PR0522765
>
COMPLIANCE INFO_2004 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:35 AM
Creation date
11/1/2018 5:39:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2015
RECORD_ID
PR0522765
PE
2220
FACILITY_ID
FA0003591
FACILITY_NAME
JOHN M RISHWAIN
STREET_NUMBER
8203
Direction
E
STREET_NAME
STATE ROUTE 26
City
STOCKTON
Zip
95215-9536
APN
10114021
CURRENT_STATUS
02
SITE_LOCATION
8203 E HWY 26
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 26\8203\PR0522765\COMPLIANCE INFO 2004 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2015
QuestysRecordDate
7/9/2018 4:36:15 PM
QuestysRecordID
3936029
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> ::,11`41tions for N-7744-9-0 (continued) <br /> .r`certified Phase Il vapor recovery systems with liquid removal devices,the permittee shall perform and pass an <br /> .'1RB TP-201.6 Liquid Removal Test within 60 days after initialstart-up all be measlenever the liquid in iued by lowering tl ethe gasoliner path <br /> ,= ceeds 100 tnl of liquid. The amount of liquid to the p p <br /> utspensing node into a container until such time that no ed cr qul iZder orid ngt graduated beaker. Tls from the nozzle, Te amount of liqui <br /> he vapor path shall be <br /> or <br /> ti rained into the container shall be measured using a grade Y <br /> Inspeci,ecl once per week_ [District Rule 4622] <br /> l'he pennit.tee shall perform and pass a Static Leaks thereafter. (District Rule 4622Tanks ]TP-201,3 within 60 days <br /> after initial start-up and at least once every 12 month <br /> y he perrnittee shall perform and pass a Dynamic Back Pressure strict Rule 4622] ARB TP 201.4 within 60 days alter initial <br /> •tart.-up and at least once every 12 months thereafter. [District <br /> TP- <br /> The peinuttee shall perforin and pass a Pressure Integrity Devices op rest using ain ealZB TP-201.1D if an overfillst using y- <br /> 1tt 1.1 or. a Pressure Integrity of Drop Tube Overfill Protection <br /> s after initial start-up and at least once every three years thereafter. (District <br /> protection device is installed,within 60 day <br /> 1Zulc 4621.] Adaptors" using procedure TP- <br /> . ,T'he permittee shall perform and pass a taand orqueof t once every three years thereafter. [DistrictAR 4621] <br /> >01,il3 within 60 days after initial start-up <br /> The District shall be notified by the permittee 15 days pr <br /> Rulet1to 08l�ch test. The test results shall be submitted to the <br /> District no later than 30 days after each test. [District <br /> The District shall be notified within 24 hours of the facility's pass/fail status after the performance of each test. <br /> I L)astrict Rule 1081] <br /> The operator shall implement a periodic maintenance <br /> 4ena The inspection pro <br /> phall be docuam for mented df n an operation ed Phase 11 and ma t napor recovery no <br /> system consistent with Section 5.4.2 of Rel pExecutive <br /> (p&M) manual and shall at a minimum contain the following <br /> i ec ma ons antion: 1) d Al <br /> l <br /> tions fforinstallation,operation, <br /> Approval Letters,and District permits; 2)The manufacturer's p <br /> repair,and maintenance required pursuant to ARB Certification ent nt nrorequirements,d 0includiang test dschedules and passing <br /> provided by the manufacturer; 3) System and/or comp g <br /> criteria for each of the standard tests. The owner/operator may include any non-ARB required diagnostic and other <br /> tests as part of the testing requirements;4)Protocol for performing periodic maintenance inspections including the <br /> components to be inspected and the defects requiring lespreQulatonsAddit AR$ i✓xeonal pu tM instructions, <br /> Districttpennit <br /> desigtne-d to ensure compliance with the applicable5 <br /> :.onditions,including replacement schedules for failure or wear prone components. [District Rule 46221 <br /> The operator shall conduct periodic maintenance inspections based on the amount 2 gasoline <br /> so igallons dispensed <br /> n ed by greater five aetlit• <br /> in a calendar month as follo�'s: A)less than 25,000 gallons-one day per week;B) <br /> days per week.All inspections shall be documented within the 0&1\4manual. [District Rule 4622] <br /> 5 The operator shall maintain monthly gasoline throughput records, [District Rule 4622] <br /> (;. All records required by this permit shall be retained on-site for a period of at least five years,and shall be made <br /> available for inspection upon request, [District Rule 4622] <br /> The operator shall maintain on the premises a log of any repairs made to the certified Phase I or Phase 11 Vapor <br /> the name of the <br /> recovery system. The repahel eb anhrall include the foll and if applicable,e ble�he name,addrewing: 1)date ss t and phone nutnberime of each �of the person's employer; <br /> person(s) who performed p each component <br /> 3) deseription of service performedf applicable',)each and 6)receipts or other documents for nponent that was repair parts u ed in the rcpair�and. if <br /> that was installed as replacement, <br /> applicable, work orders which shall include:the name and signature of the person responsible for per <br /> formint the <br /> repairs. [District)`rule 4622] <br />
The URL can be used to link to this page
Your browser does not support the video tag.