Laserfiche WebLink
40 <br /> m 10-25-02. DMA <br /> 10/23/02 Witnessed primary piping testing. Tested pressurized piping for 30 min. all <br /> primary piping passed. (Unleaded 53 psi, Super 53 psi, Diesel 56psi, Vapor 6 <br /> psi, Diesel vent 506psi) Released small amount of air to verify air in the line. DMA <br /> 10/04/02 Received+ filed training certificate for Walton Engineering. MSL <br /> 07/25/02 Approved permit to install the UST system. See approval letter w/conditions <br /> for details. This site is approved as an unmanned card-lock only. MSL <br /> 07/24/02 Spoke with Doug Wilson regarding this site. This lot is too small to meet the <br /> distance requirements for tank, well and septic. Per Walton this site is to be a <br /> card-lock. Doug Wilson said we can approve the permit to install with the <br /> condition that the well and septic will be destroyed before fuel is added to the <br /> tank. MSL <br /> 07/03/02 Received information requested from deficiency letter. MSL <br /> 06/04/02 1 Wrote deficiency letter and faxed a copy to Michael Walton. MSL <br /> 05/24/02 Received permit application to install 120 k split UST 10 k/5 k/ 5 k. MSL <br /> RW <br /> 07/07/04 Made a HW inspection. JJ <br /> 07/13/05 Facility added as a HW generator. JJ <br /> 08/04/04 Placed a call to Mike Eliason left message about the need for generator JJ <br /> requirements for this facility. <br /> 08/11/04 Filed permit and invoice, placed a call to Mike Elliason message machine JJ <br /> telling him that I wanted to speak with him about the hazardous waste <br /> inspection report. I asked him to return the call. <br /> 08/13/04 Mailed certified follow up letter for haz waste see UST file JJ <br /> 08/17/04 Received a call from Mike Eliason (Return call from 8/11/04) asking about JJ <br /> hazardous waste issues. I advised him to comply with the inspection report. <br /> 09/09/04 Spoke directly with Mike Eliason and informed him that I had not received JJ <br /> required hazardous waste information. He stated that he "light a fire under <br /> this issue to about concerns." <br /> 09/23/04 Mailed copy of hazardous waste inspection follow up letter to Mike Eliason JJ <br /> 9/23/04 (certified) <br /> 6 <br />