My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Q
>
QANTAS
>
4545
>
2200 - Hazardous Waste Program
>
PR0220070
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 2:29:01 PM
Creation date
11/1/2018 6:10:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220070
PE
2226
FACILITY_ID
FA0002502
FACILITY_NAME
PACTIV PACKAGING INC
STREET_NUMBER
4545
STREET_NAME
QANTAS
STREET_TYPE
LN
City
STOCKTON
Zip
95206
APN
17928032
CURRENT_STATUS
01
SITE_LOCATION
4545 QANTAS LN
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Supplemental fields
FilePath
\MIGRATIONS\IAError\Q\QANTAS\4545\PR0220070\COMPLIANCE INFO PRE 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GU1N <br /> ENVIRON ENTAL HEALTH D PARTMENT <br /> F0R4•Fi SAN JOAQUIN COUNTY Program Coordinators <br /> Donna K.Heran,R.E.H.S. <br /> Director 600 East Main Street, Stockton,California 95202 Kasey L.Foley,R.E.H.S. <br /> Telephone: (209)468-3420 Fax: (209) 468-3433 Robert McClellon,R.E.H.S. <br /> Jeff Carruesco,R.E.H.S. <br /> Web: www.sjgov.org/ehd Linda Turkatte,R.E.H.S. <br /> SITE HEALTH& SAFETY PLAN <br /> PART I PART II <br /> GENERAL SITE INFORMATION EVALUATION OF POTENTIAL HAZARDS <br /> L Site Name: 1. Chemicals Hazards <br /> Address: f Z_Q,f'+&—'0 L4-) XCarcinogens:�WkG W"?-- <br /> Contact Person: ZY ❑Corrosives: <br /> Phone#: ❑Dusts: <br /> Proposed Date of investigation/inspection: ❑Explosives: <br /> VFlarnmables: <br /> 2. Description and brief narrative of inspection activity: ❑Inorganic Gases: <br /> ❑New UST installation ❑UAR Investigation ❑Metals: <br /> ❑Tank Closure in Place ❑Tank/Pipe Repair ❑Oxidizers: <br /> ❑Tank/Pipe Removal ❑Re-excavation ❑PCBs: <br /> ❑Sampling ❑Boring/Monitoring Well installation ❑Other: <br /> �lazardous Waste inspection ❑Tiered Permitting inspection <br /> PART III <br /> 3. Specific Site Information: REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br /> Tank No.: Tank Capacity: 1. Monitoring Equipment(Note:Monitoring instruments must be used for all <br /> Tank Content: Tank Age: operations unless appropriate rationale or restrictions are provided): <br /> Other: ❑Combustible Gas/Oxygen Meter <br /> ❑Detector Tubes(specify): <br /> 4. Type of Operation� }(7 Qt< t1 ❑Photo ionization Detector <br /> ❑Organic Vapor Analyzer <br /> S. Release History: ❑Other(specify): <br /> Evidence of leaks/soil contamination: ❑YES ❑NO 11-�onc(see below) <br /> Documented Groundwater contamination: ❑YES ❑NO If monitoring instruments are not used,rationale or activity/area restrictions: <br /> Background and description of any previous investigation or incidence: <br /> 2. Personal Protective Equipment <br /> 6. Potential Health&Safety Physical Concerns:(✓all that apply&describe) Level of Protection: ❑A ❑B ❑C ED D <br /> ❑Heat or Cold Stress: °F(high ambient temp.) ®Hard Hat <br /> ❑Oise Sources: ❑Safety Glasses/Goggles <br /> Oxygen Deficiency: ®Steel toedishank shoes or boots <br /> ❑Excavation(falls,trips,slipping,cave-ins): ❑Flame retardant coveralls <br /> Handling and Transfer of a Hazardous Substance(fire,explosions,etc.):, Hearing protection <br /> ❑Tyvek <br /> ❑Confined space entry(explosions): ❑Respirator: ❑APR ❑ SCBA <br /> Jjklieavy equipment(physical injury&trauma resulting from moving A/P Cartridge: <br /> equipment): ®Safety vest <br /> ❑Other(specify): Wwo-way communication V40y,10- <br /> 0 Other(specify): <br /> 7. Anticipated Biological Hazards: <br /> ❑Snakessects E)Rodents ❑Poisonous Plants PART IV <br /> ❑Other/Unknown(specify): PLAN APPROVAL <br /> 8. Narrative(provide all information which could impact Health and Safety, Plan Prepared by: J <br /> e.g.,power lines,integrity of dikes,terrain,eta.): <br /> Plan Approved by: f Date: <br /> EH 23081 (2/7/2011) <br />
The URL can be used to link to this page
Your browser does not support the video tag.