Laserfiche WebLink
you produce over 3,100 gallons/yr you are merely concentrate the constituents of a hazardous <br /> captured by SB 14.) waste after it is generated,or that merely transfer <br /> the pollutant or risk to another environmental <br /> INTRODUCTION: I f you answer yes to questions 1 and 2,or to medium(i.e.,burning a hazardous waste instead <br /> question 3,you are subject to the SB 14 planning of burying it shifts the pollutants from land to air). <br /> If you routinely produce more than 12,000 requirements. If you are unsure whether your <br /> kg/yr(about 13.2 tons)of hazardous waste or 12 facility is required to prepare documents please <br /> kg/yr of extremely hazardous waste the Hazardous contact the department. WHAT IS REQUIRED? <br /> Waste Source Reduction and Management Review <br /> Act of 1989(SB 14)[Health and Safety Code Generators subject to SB 14 must evaluate <br /> Section 25244.12 et.seq.] requires you to identify WASTE STREAM EXEMPTIONS: source reduction alternatives,set goals and <br /> your major hazardous waste streams,evaluate The Department has identified several waste document the results in a plan. The plan covers <br /> source reduction opportunities,and prepare plans streams that are exempt from the planning the next 4 years,i.e.,up through 2002. <br /> and reports to document these efforts. These plans requirements. These waste streams include Generators must also document their <br /> are required to household hazardous waste motor vehicle fluids <br /> req prepared once every four years. and filters,batteries,infectious waste,asbestos, accomplishments for the last 4 years,i.e.,compare <br /> The next plans and reports must be completed by 1994 to 1998. This retrospective report should <br /> September 1, 1999. PCBs,site mitigation wastes,demolition wastes, include discussions on recycling and treatment as <br /> and wastes resulting from laboratory scale well as source reduction. The plan and report may <br /> There have been several important legislative research activities, be combined into a single document. [Note:there <br /> changes to this law since the last plans were is also a checklist option available for generators <br /> prepared in 1995. We encourage you to read this WHAT IS HAZARDOUS WASTE meeting the Gov.Code definition of a"small <br /> brochure to determine how the recent amendments SOURCE REDUCTION? business". <br /> affect you. If you have questions or need Hazardous waste source reduction is any <br /> assistance,please feel free to contact the The third requirement is to complete a <br /> action which causes a net reduction in the <br /> "Department of Toxic Substances Control(see generation of waste or that results in a lessening of summary progress report and submit this to the <br /> Where to Get Help"at the end of this brochure). the properties that cause the waste to be classified department before September 1, 1998. The other <br /> as hazardous. Source reduction occurs BEFORE a two documents are kept on site and must be made <br /> WHO IS AFFECTED? waste is generated. Examples of source reduction available to inspectors upon request. <br /> To determine if your business must comply include: WHAT'S IN A PLAN? <br /> with the source reduction planning requirements —input changes-changes in raw materials <br /> ask yourself the following questions? or feedstocks *Name,address and EPA ID# <br /> operational improvements-strategies to *A description of the type of business, <br /> 1) Did my facility generate 12,000 kg/yr or improve handling and management operations,and sources of waste <br /> more of hazardous waste or 12 kg/yr or more —production process changes-changes in *Quantity of hazardous waste <br /> of extremely hazardous waste in 1998? manufacturing methods or techniques,equipment * Evaluation of potentially viable source <br /> modifications,or changes in operating conditions reduction measures <br /> 2) Is this waste routinely generated from —product reformulation-changes in the *Goals and implementation schedule for selected <br /> ongoing operations? (One-time waste design,composition or specification of final and measures <br /> streams such as excavated soils from site intermediate products *Certifications of technical completeness and <br /> clean up are excluded.) —administrative changes-includes management review of financial implications <br /> inventory control,employee training,or waste WHAT'S IN A PERFORMANCE <br /> 3) Does my business generate aqueous minimization policies REPORT? <br /> hazardous waste that undergoes on-site * Name,address and EPA ID# <br /> treatment prior to discharge to the sewer? (If Source reduction is not treatment or actions which <br />