My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VERNALIS
>
9000
>
2200 - Hazardous Waste Program
>
PR0541637
>
COMPLIANCE INFO 2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:11:58 AM
Creation date
11/2/2018 8:28:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0541637
PE
2226
FACILITY_ID
FA0009758
FACILITY_NAME
SFPUC Tesla Treatment Facility
STREET_NUMBER
9000
Direction
W
STREET_NAME
VERNALIS
STREET_TYPE
Rd
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
9000 W Vernalis Rd
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VERNALIS\9000\PR0541637\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
7/16/2018 5:10:22 PM
QuestysRecordID
3942164
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elena K. Manzo [EH] <br />From: Scott, Anthony <AScott@sfwater.org> <br />Sent: Tuesday, December 13, 2016 8;22 AM <br />To: Elena K. Manzo [EH] <br />Cc: Scott, Anthony <br />Subject: RE: Tesla Treatment Facility UV Reactor 2030 Lamp Break <br />Elena, <br />Good morning. Elena I attempted to contact you by phone yesterday, I left a message stating we <br />were resuming the lamp break clean up. The glass was removed from inside the UV reactor Saturday <br />December loth. The surrounding glass was swept up yesterday December 11th and both placed in a <br />five gallon container sealed and labeled. I have our Maintenance Engineering Department reviewing <br />the December 7 1 Incident Report and locating the facility floor drain piping blue prints you requested. <br />As soon as I receive these items I will forward them to you. Any questions please let me know. <br />Thank you, <br />Anthony Scott <br />EBFF <br />Chief Stationary Engineer / WS&TD <br />Work # 925-862-5711 <br />ascott(&sfwater,org <br />
The URL can be used to link to this page
Your browser does not support the video tag.