Laserfiche WebLink
FILE COPY <br />ACTIVITY LOG (ICS 214) <br />1. Incident Name: <br />TTS Construction <br />2. Operational Period: Date From: 1/23/13 Date To: <br />I Time From: Time To: <br />3. Name: <br />Muniappa Naidu <br />4. ICS Position: <br />5. Home Agency (and Unit): <br />EHD <br />6. Resources Assigned: <br />Name ICS Position Home Agency (and Unit) <br />7. Activity Log: <br />Date/Time Notable Activities <br />1/23/13 Received notification that a spill had occurred due to employee error. Went to thew site <br />and met with Rudge Wynn, TTS Construction. He said that while working with the heavy <br />equipment the employee accidently spilled approximately 20 gallons of diesel on the <br />ground. He said that Thorpe Oil has been hired to perform the cleanup. Later talked to <br />Marty Thorpe and he informed that the clean up will be set up at a later date and that <br />confirmation samples will be taken. <br />1/31/13 1 went to the site and met with Marty Thorpe. Visually inspected the area and there was no <br />stain on the ground. A sample was taken from the middle of the pit. Sample results and <br />disposal records were requested. Clean up complete. <br />8. Prepared by: Name: i7Vosii1on/Title: -E __Signature: W1 ��I.art 17-a <br />ICS 214, Page 1 X Date/Time: '/-I-S/13 <br />