Laserfiche WebLink
Stacy Rivera [EH] <br /> From: Giovanni Bondoc <GBondoc@berberianmotors.com> <br /> Sent: Saturday,July 30, 2016 8:32 PM <br /> To: Stacy Rivera [EH] <br /> Cc: Giovanni Bondoc <br /> Subject: Return to Compliance - Berberian European Motors LLC <br /> Attachments: Berberian European Motors DBA Merceedez Benz Stkn [61446].pdf, 1566_001 <br /> [530191.pdf, Return to Compliance Certification-signed.pdf <br /> Importance: High <br /> Ms. Rivera: <br /> Please find attached documents specifying Berberian European Motors taking corrective action per your inspection on <br /> July 1,2016. <br /> 1 was able to engage Clean Harbors Environmental Services Inc. on July 25th as indicated on attached quote. <br /> Clean Harbors Environmental Services crew was scheduled to perform the scope of work on July 28th, 2016. <br /> During the two days(July 28"—July 29th)CHES crew addressed the following: <br /> • Completely drain and clean 10 empty rolling oil drums used for draining oil from vehicles <br /> • Empty 5-gallon bucket of oil and sludge at the Parts Washer and place bucket in solid waste drum <br /> • Completely drain and clean oily liquid in a spill pallet <br /> • Drain reddish liquid in 5-gallon bucket and place bucket in solid waste drum <br /> • Drain and cleaned 6 oil tanks using triple rinse method <br /> 0 1 waste oil tank <br /> 0 5 fresh oil tanks <br /> • Leave on site seven (7)55-gallon drums with waste.Safety Kleen will handle proper disposal and generate <br /> manifest. <br /> 0 6 drums with liquid waste <br /> 0 1 drum with solid waste <br /> At the completion of the work above, CHES Foreman Daryl McNear, completed 2 work orders indicating work completed <br /> and Certification of Cleaning on all 6 oil tanks(attached). CHES office will complete and send a final report and photos <br /> to support the completed work once the crew has physically reported back on July 29th. <br /> I submit this today,July 30th with all the documentation I have available to support our effort to comply and meet <br /> requirements. Final documents and photos received from CHES and Safety Kleen will be submitted to you immediately <br /> upon receipt. <br /> Please contact me directly the soonest we can review our Return to Compliance Certification with any or further <br /> instructions. <br /> Regards, <br /> Giovanni Bondoc <br /> Service and Parts Director <br /> 1 <br />