Laserfiche WebLink
Eli <br />SCALE: 1" = 10' <br />File: P:\SDSKPROJ\7063\MECHANIC:AL\TANKS\706311C11.DWG Date/Time: 04/26/1999 13:27 Scale: 1=96 stave Xrefs: <br />i , M <br />iT11T�! <br />Constructed , <br />eHier mw R <br />a <br />♦ 4 Sierra <br />CA <br />94568 <br />ii . . <br />PRODUCT2 CONTRACTOR TO REINS -TALL (10) TIEN TOKHEIM 262A DUAL HOSE <br />SHOWN.AS DISPENSERS BALANCE«♦► r <br />AND <br />PRODUCTUNDER DISPENSER CONTAINMENT INCLUDING <br />SEE DWGS. TK3-3 AND TK3-4 » TYPICAL INSTALLATION DETAILS. <br />REMOVEDCONTRACTOR SHALL FIELD LOCAlt, INIERCEPI AND CUT EXISTING CONDUIT ROUTED TO <br />DISPENSERS AT A CONVENIENT LOCATION. REMOVE ALL WIRING BACK TO PANEL.r ABANDON <br />ALL CONDUITS NOT BEING REUSED, CHECK CIRCUIT BREAKERS IN PANEL <br />R LOAD SERVICEABILITY <br />'TO THE DISPENSERS REMOVE ALL BREAKERS REPLACE f <br />ALL ELECTRICAL WORK SHALL CONFORM TO THE UNIFORM ELECTRICAL CODE 1994 EDITION AND TO ALL <br />LOCAL tl "EMENTS. NOTE THAT EXISTING CONDUIT LOCATIONSARE ASSUMED. <br />ONE CONDUIT SHALL <br />i <br />BE COMMUNICATION <br />FOR <br />C 23 <br />24 CONTRACTOR TO PATCH AND REPAIR ALL ASPHALT AFFECTED BY THE NEW TANK AND PIPING INSTALLATION AND ALL OTHER <br />DAMAGED ASPHALT ON SITE, SAWCUT CLEAN ALL ADJACENT ASPHALT IN REPAIR AREAS BEFORE PATCHING. SLURRY <br />COAT ALL ASPHALT ON SITE AND RESTRIPE PARKING SPACES. <br />25 EXISTING PIC (PAY ISLAND CASHIERS) TO REMAIN, <br />GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM 'THE DIVISION OF INDUSTRIAL SAFETY (STATE OF CALIFORNIA) <br />FOR EXCAVATIONS OF TRENCHES 5'-(Y' OR MORE IN DEPTHM TO DESCEND. <br />! <br />GENERAL CONTRACTORt PRIOR <br />TO ANY REQUIRED INSPECTIONS. <br />'A * AT . <br />PRIMARYPHASES AS REQUIRED: <br />1TANK AND HYDROSTATICALLYOR PNEUMATICALLY TESTED FOR 30 MINUTES. <br />INSPECTION » MANUFACTURER'S <br />INSPECTION3. FINAL DING ALL PORTIONS OF THE LEAK DETECTION <br />ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LAKE TEST) WITH <br />STANDING WATER FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. THE <br />ENGINEER MUST SIGN OFF ON THIS TESTING ON THE TANK Y. CHECKLIST OR OWNER'S CONTRACTOR WILL BE P. <br />PRIORTANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING <br />AGENCY PLACED OPERATION. <br />HALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS <br />*N RECOGNIZED <br />NO. ARCO PRODUCTS COMPANY MASTER REVISIONS <br />NO. DATE REVISIONS PROJECT RELEASE <br />JPERMIT <br />+I; <br />General Notes <br />PIPING LEGEND <br />89 NEW DOUBLE WALL (2" PRIMARY, 3' SECONDARY) FIBERGLASS � PRODUCT PIPING <br />co <br />VR NEW SINGLE WALL FIBERGLASS VAPOR RECOVERY PIPING <br />I� <br />V . - NEW 2" SINGLE WALL FIBERRGLASS VENT PIPING <br />NEW CONDUIT <br />TRENCH OR EXCAVATION LINE <br />1 • <br />THE GENERAL CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS PRIOR TO BID SUBMISSION. <br />2. <br />ALL DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. <br />' <br />ANY DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNER'S ENGINEER FOR HIS DECISION BEFORE <br />PROCEEDING WITH THE WORK. <br />3. <br />INSTALLATION AND TESTING OF PIPING AND SHALL BE PERFORMED BY A LICENSED TANK SERVICE PROVIDER AS REQUIRED <br />BY THE STATE AND LOCAL REQUIREMENTS. CONTRACTOR SHALL, PROVIDE NOTIFICATION TO THE JURISDICTIONAL <br />:. <br />AGENCY RESPONSIBLE FOR INSPECTIONS ACCORDING TO THE PERMIT REQUIREMENTS. <br />4. <br />ALL ELECTRICAL WORK PERFORMED WITHIN CLASS I HAZARDOUS AREAS SHALL BE SEALED PER NEC AND UFC <br />REQUIREMENTS. <br />C <br />5, <br />THE PRODUCT PIPING LAYOUT SHOWN ON 'THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND ARE NOT <br />Cd <br />INTENDED TO BE AN EXACT REPRESENTATION OF THE PIPING LAYOUT. GENERAL, CONTRACTOR TO RELOCATE, <br />MODIFY AND ADJUST PIPING INSTALLATION TO PROVIDE A SYSTEM CONSISTENT WITH THE. INTENT OF THE DESIGN. <br />l <br />GENERAL CONTRACTOR SHALL PREPARE "AS -BUILT" PLANS UPON THE COMPLf7ION OF THE INSTALLATION. <br />6, <br />ALL UNDERGROUND PIPING SHALL BE FIBERGLASS UNLESS NOTED OTHERWISE AND SHALL BE INSTALLED PER <br />MANUFACTURERS SPECIFICATIONS. <br />7. <br />THE GENERAL CONTRACTOR SHALL INSTALL ALL EQUIPMENT REQUIRED FOR COMPLETE INSTALLATION WHETHER OR <br />NOT THE EQUIPMENT IS PROVIDED BY OWNER OR OTHERS. <br />8. <br />GENERAL CONTRACTOR SHALL CONDUCT THEIR WORK IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL_ <br />LAWS AND REGULATIONS. <br />1 <br />INSTALL ONE 20,000 GALLON AND ONE 12,000/10,000 GALLON SPLIT DOUBLE WALL FIBERGLASS TANKS WITH <br />"VEEDER ROOT" TLS -350 TANK AND PIPING M(INITORING AND ALARM SYSTEM. TANKS TO BE SET MIN. 48" <br />RECEIVED <br />BELOW FINISH GRADE. SEE DWGS. TK2-1A & TK2--1B FOR ADDITIONAL INFORMATION. SEE DETAIL #19 <br />ON DWG. TK3--5 FOR TANK ANCHORING IF REQUIRED. SEE DETAIL <br />10 ON DWG. TK3--2 FOR TYPICAL PIPING <br />ARRANGEMENT AT TANKS. TANK INSTALLATION PER MANUFACTURER'S <br />NSTRUCTTONS. <br />AUG 0 9 1999 <br />NOTE: DUAL FILL PORTS ARE TO BE INSTALLED ON THE 20,000 GALLON ' 87 OCTANE TANK ONLY. <br />2 <br />ENVIRONMENTAL HEALTH <br />INSTALL A 6" REINFORCED CONCRETE SLAB OVER TANKS. SET MANHOLE COVERS <br />1-1/r ABOVE SLAB. SEE DETAIL #18 ON DWG. TK3-5. . <br />PERK lT SERVICES <br />INSTALI_ FOUR (4) 4" DUAL POINT FILLS. SEE DWGS. TK2-1A & TK2 -1B. <br />NOTE THE 20,000 GALLON 87 OCTANE TANK SHALL HAVE DUAL FILL PORTS, <br />4 <br />INSTALL FOUR (4) 3" DUAL POINT` STAGE I VAPOR RECOVERY:, FITTINGS, SEE DWG. TK2--1A & TK2•-1 B. <br />NOTE: THE 20,000 GALLON 87 OCTANE TANK SHALL HAVE DUAL STAGE I FITTINGS INSTALLED. <br />5 <br />INSTALL NEW 2 HP VARIBLE SPEED TURBINES IN ALL TANKS. TURBINES SHALL BE EQUIPPED WITH 3 GPH ELECTRONIC LEAK DETECTORS. <br />CONTRACTOR SHALL FIELD LOCATE;` INTERCEPT AND ROUTE EXISTING CONDUITS TO NEW TURBINE LOCATIONS <br />PULL_ NEW WIRE FROM PANELBOARD TO SERVE NEW TURBINES. CHECK CIRCUIT BREAKERS IN PANEL FOR LOAD SERVICEABILITY FOR <br />NEW TURBINES, REPLACE IF NEEDED. ALL ELECTRICAL WORK SHALL CONFORM TO THE UNIFORM ELECTRICAL CODE 1994 EDITION <br />AND TO ALL LOCAL REQUIREMENTS. NOTE THAT EXISTING CONDUIT LOCATIONS ARE ASSUMED, <br />6 <br />INSTALL 3" SINGLE WALL STAGE I[ VAPOR RECOVERY LINE FOR "BALANCE* VAPOR RECOVERY SYSTEM. <br />SLOPE 1/8" PER FOOT MINIMUM,TO,,1AINKS. SEE DETAILS AND SECTIONS ON DWG. TK3-3. <br />INSTALL THREE Z' DOUBLE WALL PRODUCT LINES. LINES TO BE EQUIPPED WITH LIQUID I..EAK MONITOR SENSOR <br />IN PIPING SUMP ATTACHED TO TANK AND WIRED FOR TURBINE SHUT DOWN. SLOPE 1/8" PER FOOT MINIMUM TO <br />TANKS. SEE DETAIL #1 ON DWG. TK4-2 FOR SUMP SENSOR DETAIL. SEE DWG. TK4-1 FOR WIRING DIAGRAM. <br />PIPING SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATION AND INSTRUCTIONS, <br />8 <br />INSTALL "VEEDER ROOT" TANK AND LINE ALARM CONTROL PANEL MODEL.TLS-350 IN BUILDING <br />SEE DRAWING TK4-�1 FOR LEAK DETECTION AND DISPENSER WIRING DIAG M. <br />" <br />(9D <br />INSTALL NEW THREE (3) 2`° SINGLE WALL FIBERGLASS VENT LINES TO TANKS. TO EXISTING VENT RISERS AT BUILDING. CONTRACTOR TO <br />VERIFY THAT THE TERMINATION POINT OF EXISTING TANK VENTS TO BE A MINIMUM OF 12' ABOVE GRADE, 30 INCHES ABOVE ROOF <br />LINE AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY LINE THAT CAN BE BUILT UPON AND IN ACCORDANCE <br />WITH UNIFORM FIRE CODE REQUIREMENTS. SEE DETAIL. #4 ON DRAWING TK3-1. <br />10 <br />INSTALL TWO (2) ANNULARSPACE MONITOR PROBES. SEE DWGS. TK2-1A & TK2-1B. <br />SEE DETAIL 2 ON DWG TK4-2. <br />(JD <br />INSTALL BALL FLOAT VALVE ASSEMBLY FOR VENT & STAGE II VAPOR RECOVERY, <br />.EXTRACTOR <br />SEE DWGS. TK2-1A & TK --1B, SEE DETAIL #5 ON DWG. TK3-1. <br />12 <br />SEE DRAWING TK4--2 FOR MONITORING CONDUIT DETAIL AND SENSOR AND PROBE MOUNTING DETAILS. <br />13 <br />NOT USED. <br />Qq <br />INSTALL TWO (2) IN5PLGIIUN/MQNITUKING WELLS AS SHOWN. SEE DWGS. TK2-1A AND 1x2 --IB, <br />15 <br />FOR IDENTIFICATION MARKINGS AT TANK MANHOLES, SEE DETAIL #20 ON DWG. TK3-5. <br />i 6 <br />INSTALL 2" DIA. INACTIVE SIPHON' LINES BETWEEN 87 OCTANE TANK AND 89 OCTANE TANK AS SHOWN. <br />SEE DETAILS #6, #7 AND #8 ON DWG. TK3-2. <br />INSTALL STATIC GROUNDING SYSTEM AS PER DETAIL #4 ON DWG. TK4-2. <br />C <br />i , M <br />iT11T�! <br />Constructed , <br />eHier mw R <br />a <br />♦ 4 Sierra <br />CA <br />94568 <br />ii . . <br />PRODUCT2 CONTRACTOR TO REINS -TALL (10) TIEN TOKHEIM 262A DUAL HOSE <br />SHOWN.AS DISPENSERS BALANCE«♦► r <br />AND <br />PRODUCTUNDER DISPENSER CONTAINMENT INCLUDING <br />SEE DWGS. TK3-3 AND TK3-4 » TYPICAL INSTALLATION DETAILS. <br />REMOVEDCONTRACTOR SHALL FIELD LOCAlt, INIERCEPI AND CUT EXISTING CONDUIT ROUTED TO <br />DISPENSERS AT A CONVENIENT LOCATION. REMOVE ALL WIRING BACK TO PANEL.r ABANDON <br />ALL CONDUITS NOT BEING REUSED, CHECK CIRCUIT BREAKERS IN PANEL <br />R LOAD SERVICEABILITY <br />'TO THE DISPENSERS REMOVE ALL BREAKERS REPLACE f <br />ALL ELECTRICAL WORK SHALL CONFORM TO THE UNIFORM ELECTRICAL CODE 1994 EDITION AND TO ALL <br />LOCAL tl "EMENTS. NOTE THAT EXISTING CONDUIT LOCATIONSARE ASSUMED. <br />ONE CONDUIT SHALL <br />i <br />BE COMMUNICATION <br />FOR <br />C 23 <br />24 CONTRACTOR TO PATCH AND REPAIR ALL ASPHALT AFFECTED BY THE NEW TANK AND PIPING INSTALLATION AND ALL OTHER <br />DAMAGED ASPHALT ON SITE, SAWCUT CLEAN ALL ADJACENT ASPHALT IN REPAIR AREAS BEFORE PATCHING. SLURRY <br />COAT ALL ASPHALT ON SITE AND RESTRIPE PARKING SPACES. <br />25 EXISTING PIC (PAY ISLAND CASHIERS) TO REMAIN, <br />GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM 'THE DIVISION OF INDUSTRIAL SAFETY (STATE OF CALIFORNIA) <br />FOR EXCAVATIONS OF TRENCHES 5'-(Y' OR MORE IN DEPTHM TO DESCEND. <br />! <br />GENERAL CONTRACTORt PRIOR <br />TO ANY REQUIRED INSPECTIONS. <br />'A * AT . <br />PRIMARYPHASES AS REQUIRED: <br />1TANK AND HYDROSTATICALLYOR PNEUMATICALLY TESTED FOR 30 MINUTES. <br />INSPECTION » MANUFACTURER'S <br />INSPECTION3. FINAL DING ALL PORTIONS OF THE LEAK DETECTION <br />ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LAKE TEST) WITH <br />STANDING WATER FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. THE <br />ENGINEER MUST SIGN OFF ON THIS TESTING ON THE TANK Y. CHECKLIST OR OWNER'S CONTRACTOR WILL BE P. <br />PRIORTANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING <br />AGENCY PLACED OPERATION. <br />HALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS <br />*N RECOGNIZED <br />NO. ARCO PRODUCTS COMPANY MASTER REVISIONS <br />NO. DATE REVISIONS PROJECT RELEASE <br />JPERMIT <br />"LAND PLANNING AND DMGN SPECIALISTV <br />KENT, WASHINGTON 98032 <br />(425) 251-6222 <br />i. <br />master release <br />praj. exe. drawn by <br />project / facility <br />4932 <br />sheet / file <br />AB -1 <br />Of <br />+I; <br />co <br />I� <br />' <br />Cd <br />Co <br />%o <br />:. <br />ca <br />C <br />L_ <br />C <br />Cd <br />0 <br />l <br />"LAND PLANNING AND DMGN SPECIALISTV <br />KENT, WASHINGTON 98032 <br />(425) 251-6222 <br />i. <br />master release <br />praj. exe. drawn by <br />project / facility <br />4932 <br />sheet / file <br />AB -1 <br />Of <br />