Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR MAY 2 3 2016 <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD), <br /> 1. Site map enclosed? YES[I NO[j <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component,describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> DISPENSER CHANGE OUT- Remove Gilbarco Advantage install Gilbarco Encore 700 <br /> Install(2) Bravo dispenser frames <br /> i <br /> i <br /> 1 <br /> I <br /> f <br /> i <br /> 1 <br /> 7� <br /> I <br /> I <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> i <br /> i <br /> (2) Bravo Conversion Frames CONV-6200 j <br /> I <br /> 3 <br />