My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1405
>
2300 - Underground Storage Tank Program
>
PR0231485
>
COMPLIANCE INFO 2013 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:23 AM
Creation date
11/2/2018 3:44:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2016
RECORD_ID
PR0231485
PE
2361
FACILITY_ID
FA0000306
FACILITY_NAME
EMILS LIQUOR & SPORTS SHOP*
STREET_NUMBER
1405
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22707031
CURRENT_STATUS
01
SITE_LOCATION
1405 CALIFORNIA ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CALIFORNIA\1405\PR0231485\COMPLIANCE INFO 2013 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2013 - 2016
QuestysRecordDate
5/11/2018 4:45:55 PM
QuestysRecordID
3888620
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02/01/2006 09:59 7077659900 RK- DESIGN .PAGE 02 <br /> James H. Ray MAY 2 3 2016 <br /> CIVIL ENGINEER <br /> 2041Ifidden Valley Drive <br /> Santa Rosa.CA 95404 <br /> 707480-8115 <br /> FEBRUARY 20,2006 <br /> S. bravo S.ystems,'Inc: <br /> 2929 Vail Avenue <br /> Commerce,C.A.9004D <br /> RE: STATE REGISTERED PROFESSIONAL ENGINEER APPROVAL <br /> CCR Title 23 Division 3,Chapter 16,Section 2636(g)(2) <br /> BRAVO DISPENSER CONVERSION FRAME-MODEL CONV-B2000 <br /> This surface mounted dispenser anchorage frame adapts an existing installed under <br /> dispenser containment to a new dispenser. <br /> I have examined and reviewed the following items on the Bravo Dispenser Conversion <br /> Frame: <br /> 1. Bravo catalog sheet with specifications. <br /> 2. B2000 Conversion Frame Installation Instructions. <br /> Upon review of the materials and construction it is my opinion and conclusion that <br /> sound engineering design and engineering of the product provides an adapter that allows <br /> i for the replacement of an existing dispenser leaving the existing under dispenser <br /> t containment in place. <br /> �e <br /> James H.Ray <br /> Civil Engineer pp,24,53a <br />
The URL can be used to link to this page
Your browser does not support the video tag.