Laserfiche WebLink
ORIGINAL <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained F i E IVED <br /> 1. Site map enclosed? YES[] NOK IViAY 15 2015 <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of ttjgMNAgWALrn61E9itfFitt <br /> Plan"is available on the jobsite as required by Title 8. PERMIT/SERVICES <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Replaced tank annular sensor to eliminate cable splice outside of junction box. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> 794390-420: SENSOR. Annular. BELL FLOAT.Veeder-Root <br /> 2 <br />