Laserfiche WebLink
SwRCB, January 2002 Pane <br /> S. SPILL/OVERFILL, CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spiil/Overff Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: J Spill Bucket Manufacturer —Industry Standard Professional Engineer <br /> 2 Other(Specify) <br /> Test Method Used: ]Pressure ❑Vacuum 7T'drestatic <br /> Other(Specify) <br /> Test Equipment Used: 64 e-X. z4Equipment Resolution i <br /> spill <br /> ]lox i Spill Box!! Spill liox# Spill Box# <br /> Bucket Diameter: "Z <br /> BudrA Depth: t <br /> wart time baweea applying <br /> preswa-Jvxwumlwater and <br /> starting teat: IJ <br /> Tea Start Time: <br /> Initial Reading(RJ: <br /> Tea End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RrRt): <br /> PasslPail Threshold or <br /> Criteria: I <br /> .tie ala f5mi- DLSa E} Each [)i+a rl-fasa:-, [a s#Aw E Paas 'sail <br /> COMMent6—(Imk de information on.>epdrs made prior to testing,and recanrmended follow-apor failed tests) <br />