Laserfiche WebLink
SWRCB, January 2002 • <br /> Page_of_ <br /> 8. SPII,I,/OVERFILL CONTAINMENT BOXES <br /> Facili is Not E ui ped With S ilUOverfill Containment Boxes ❑ <br /> SPIWOverfill Containment Boxes are Present, but were Not Tested <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer 0 Indust Standard <br /> Industry 0 Professional❑Other(Sped) Engineer <br /> Test Method Used: ❑Pressure ❑Vacuum []Hydrostatic <br /> ❑Other(Specie) <br /> Test Equipment Used: <br /> Equipment <br /> 5 Resolution <br /> Spill Box# Spill Boa# Spill Box9 # Spill Boa# <br /> Bucket Diameter. m-�--- <br /> P <br /> Bucket Depth: — <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Find Reading(Rt,): <br /> Test Duration: <br /> Change in Reading(BLi Pq): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass 11 Fail O Pass ❑Fail D Pass D Fail Q Pass O Fail <br /> Comments—(inchrde information on repmrs made pnor to testin , and recommended ollow-a or failed tests) <br />