My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1405
>
2300 - Underground Storage Tank Program
>
PR0231485
>
COMPLIANCE INFO 2001-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 11:44:39 AM
Creation date
11/2/2018 3:45:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2012
RECORD_ID
PR0231485
PE
2361
FACILITY_ID
FA0000306
FACILITY_NAME
EMILS LIQUOR & SPORTS SHOP*
STREET_NUMBER
1405
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22707031
CURRENT_STATUS
01
SITE_LOCATION
1405 CALIFORNIA ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CALIFORNIA\1405\PR0231485\COMPLIANCE INFO 2001-2012.PDF
QuestysFileName
COMPLIANCE INFO 2001-2012
QuestysRecordDate
5/14/2018 3:33:43 PM
QuestysRecordID
3891081
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer KIndustry Standard 0 Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: 19 Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: PRESSURE Equipment Resolution: PSI <br /> Piping Run#87 Piping Run#89 Piping Run#DSL Piping Rain# <br /> Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: SMITH SMITH SMITH <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: 100' 100' 50' <br /> Product Stored: FUEL FUEL FUEL <br /> Method and location of BOOTED,SUMPS BOOTED,SUMPS BOOTED,SUMPS <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: Epsi <br /> 1008 1103 <br /> Initial Reading(R,): 3 psi 3 psi <br /> Test End Time: 1108 1203 <br /> Final Reading(RF): 3 psi 3 psi <br /> Test Duration: 1 hr 1 hr <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Test Result: UL Pass 0 Fail &Pass 0 Fail R Pass 0 Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.