Laserfiche WebLink
SWRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer KIndustry Standard 0 Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: 19 Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: PRESSURE Equipment Resolution: PSI <br /> Piping Run#87 Piping Run#89 Piping Run#DSL Piping Rain# <br /> Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: SMITH SMITH SMITH <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: 100' 100' 50' <br /> Product Stored: FUEL FUEL FUEL <br /> Method and location of BOOTED,SUMPS BOOTED,SUMPS BOOTED,SUMPS <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: Epsi <br /> 1008 1103 <br /> Initial Reading(R,): 3 psi 3 psi <br /> Test End Time: 1108 1203 <br /> Final Reading(RF): 3 psi 3 psi <br /> Test Duration: 1 hr 1 hr <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Test Result: UL Pass 0 Fail &Pass 0 Fail R Pass 0 Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br />