My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1990
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1800
>
2300 - Underground Storage Tank Program
>
PR0231036
>
INSTALL_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:36 AM
Creation date
11/2/2018 3:49:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1990
RECORD_ID
PR0231036
PE
2361
FACILITY_ID
FA0003761
FACILITY_NAME
ST JOSEPHS HOSPITAL
STREET_NUMBER
1800
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12718044
CURRENT_STATUS
01
SITE_LOCATION
1800 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CALIFORNIA\1800\PR0231036\INSTALL\INSTALL PLAN 1990.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
''CONTAINING Containment elbows and reducers alwg with snort -pieces or piping <br />SWING JOINTS can be combined to encase swing joints to just below the shear <br />valve. <br />The same system can also be used to contain 1-1/21' flex <br />connectors. The Containment fittings will not seal on the body e <br />the flexible connector. A short galvanized nipple between the en, <br />of the connector and the shear valve should be provided for <br />sealing of the reducer. <br />1.112" STEEL AIME d FITTINGS <br />REDUCER <br />CAN REBUTTED TOGETHER <br />-�--90- ELBOW SHELL <br />BONDING AND TESTING <br />Bonding of primary system can only commence after Containment <br />PRIMARY SYSTEM <br />pipe has been positioned over it and all final adjustments made <br />for clearance or interference problems. Bonding of primary lines <br />in accordance with Ameron Bulletin 7501 can be accomplished by <br />sliding the Containment pipe away from the primary line bonding <br />area. Take care to not disturb the bonds on the primary piping' <br />before the C20HT adhesive cures. <br />Primary lines must be tested before installing the Containment <br />fittings to allow visual and/or soap testing of primary lines and <br />fittings. <br />MIXING OF <br />In cold weather, warming the resin to 70°F (210C) is required to <br />SC -10 ADHESIVE <br />permit good mixing and easier application. <br />To mix the adhesive, first empty all the hardener* into the can c <br />resin. Mix all of the hardener and resin in the supplied <br />proportions, never try to split a kit. <br />Mix the hardener and resin thoroughly with the wooden spatula <br />until all streaks are gone and the adhesive has a smooth uniform <br />color (green). Take care to scrape and mix all resin from the li <br />and from under the upper lip of the can. Stirring too vigorously <br />can either cause some hardener to splash out or result in <br />excessive air entrapment. <br />There is enough SC -10 adhesive in each kit to bond together at <br />Least 2 Containment fittings regardless of pipe size or fitting. <br />* The hardener contained in the adhesive kits might burn the skin. Inhaling the vapors <br />should be avoided. The label precautions should be read and observed. b <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.