My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1990
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1800
>
2300 - Underground Storage Tank Program
>
PR0231036
>
INSTALL_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:36 AM
Creation date
11/2/2018 3:49:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1990
RECORD_ID
PR0231036
PE
2361
FACILITY_ID
FA0003761
FACILITY_NAME
ST JOSEPHS HOSPITAL
STREET_NUMBER
1800
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12718044
CURRENT_STATUS
01
SITE_LOCATION
1800 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CALIFORNIA\1800\PR0231036\INSTALL\INSTALL PLAN 1990.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UNDERGROUND STORAGE TANKS - PLAN ADDITION/CORRECTION SHEET <br />The following checked and/or underlined items are to be addressed on plans: <br />GENERAL <br />I. Provide the name and address of the facility. <br />2. Provide the name, address, and Phone numbers �off t�ie contractor(s), facility <br />owner(s), and operator(s). ��L��4!GCdraJ pili <br />V 3. Provide four complete sets of plans. (One to be retained by this office). <br />Include specification sheets, equipment brochures, monitoring, and response <br />plans. <br />V 4. Provide plans to scale in nonerasable blueprint. <br />CONSTRUCTION STANDARDS �/ 1 <br />Locations) and number of tanks. <br />22. Type of tank(s) to be installed. <br />A. Steel clad with fiberglass reinforced plastic. cJ <br />1. 35,000 to 40,000 volt Holiday Test required before "setting" tank(s) <br />in ground. <br />B. Fiberglass <br />1. Striker plate dimensions and materials. p 7� <br />2. Striker plates under all accessible opAgs.P$4J/5 <br />C. Nonclad steel <br />1. Cathodic protection provided (including nuts, bolts, washers, etc.). <br />a. Approved by a corrosion engineer or NACE technician. <br />b. Document stating inspection method and frequency (Minimum semi- <br />annual inspection required). <br />D. Other types of tanks <br />1. Construction specification standards for durability. <br />�T3. Tank Capacity (List specific gallonage). <br />Ft4"6 4. Contents to be stored in each tank (Be specific). <br />A. Verification of product compatability with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. -,�31� <br />1. List testing organization and approval. <br />5. Provide manufacturers written installation instructions. (Include all piping, <br />monitors, tanks, etc. <br />i?rte ss cvice dQ-;q i rte, /7&� r dOQJQ4;, ylz_e� <br />Note - NFPA 30 Test required before covering tdnk add Items. NFPA 0 Test <br />is required on BOTH the Primary and Secondary containment systems. <br />Double walled tanks using pressure or vacuum testing to monitor annular <br />space are exempt from testing secondary container. P.4j�- 3 7 <br />Note - NFPA 329 "Precision Test" required upon completion of installations. <br />ne—test result copy to be sent directly to this department from the <br />testing company. <br />
The URL can be used to link to this page
Your browser does not support the video tag.