Laserfiche WebLink
LM <br />SJMC/MASTER UTILITY PLANT, 78"09 <br />%GLS ccyoc �` �G�OCJd -fir sf d� /l� dDd <br />SECTION 15485 - FUEL OIL SYSTEMS <br />A. PART 1 - GENERAL <br />1. CONDITIONS OF THE CONTRACT: <br />The Condition§ of the Contract (General, Supplementary, and other <br />Conditions) and the General Requirements (Sections of Division 1) are hereby <br />made a part of this Section. <br />Division -15 Basic Mechanical Materials and Methods sections apply to work of <br />this section. <br />2. WORK INCLUDED: <br />Types of equipment required for this project include the following: <br />Fuel Oil Storage Tank <br />Fuel Oil Pumps <br />Fuel Oil Piping <br />Miscellaneous Items <br />3. QUALITY ASSURANCE: <br />Codes and Standards: <br />U.L. Compliance: Provide components which have been listed and labeled <br />by U.L. <br />National Board of Fire Underwriters: Fuel oil tank shall be constructed <br />in accordance with Board requirements. <br />4. SUBMITTALS: <br />Product Data: Submit manufacturer's technical product data and installation <br />instructions for each type of material listed in this SECTION. <br />Maintenance Data: Submit maintenance data and replacement material lists <br />for each type of material listed in this section. Include this data and <br />product data in maintenance manual. <br />B. PART 2 - MATERIALS <br />• 1. FUEL STORAGE TANK: <br />Furnish and install an underground double-wall, containment type fuel <br />storage tank with capacity of as indicated on Drawings. The tank shall be <br />fabricated of fiberglas reinforced isophthalic polyester resin with suitable <br />reinforcing ribs. The tank shall be designed to withstand the earth loading to <br />the depth of the installation. Provide tank openings as indicated on Drawings. <br />2. FUEL OIL PIPING: <br />Provide and install Ameron "Bondstrand" or equal Dualoy 3000/L fiberglass <br />FUEL OIL SYSTEMS <br />15485 — 1 <br />