Laserfiche WebLink
VOW v <br /> •; Page 4 <br /> • HISTORY & SCOPE OF WORK <br /> 1 .0 History & Scope of Works <br /> 1 . 1 History: <br /> Write a brief history of what was on site (gas station, <br /> private use, dry cleaning establishment , etc ) <br /> 1 .2 Scope of Work ; <br /> Write a scope of work for this project-- <br /> Type of material stored in tarda . <br /> Number , position & size of tacks to br, removed . <br /> Activities (excavation, removal , cutting, etc ) <br /> Pump out product before removal , inert tanks with a <br /> minimum of 15 pounds of dry ice per 1 ,000 gallon tank: <br /> capacity. <br /> Check Lower Explosive Limit (LEI...) <br /> 1 .3 Responsibilities of Other- Aqencies Present : <br /> a. The Environmental Health Dc-_partmcrit is responsirhle <br /> fon- approval and inspection of procedures, inc.1tiding <br /> tank removal , sample procurement and integrity of <br /> work plan. <br /> b. 'The Fire Department is responsible for inspractiar, <br /> relative to safe proredr_ires and condition of tank <br /> prior to removal . <br /> 1.1 History: <br /> The site located at M00 A9. C-/iLi-L STOCjn?_syvr 0P* <br /> CA. is an establishment uses as a facility to r-cwSTr-oL IPULz-L Plf,�_ <br /> SrlavaDA4� GE;aE.R/a�t6Q . <br /> 1.2 Scope of Work: <br /> The work consists of the removal of(-I ) 10)00< gallon <br /> underground fuel storage tanks. During the removal procedure, all <br /> liquids will be pumpedandstored in 55 gallon drums until they are <br /> pumped and hauled for disposal by a certified hazardous material <br /> hauler. The tank will be inerted with a minimum of 20 pounds of <br /> dry ice per 1,000 gallsons capactiy. The explosive limit (LEL) <br /> will be checked before actual removal of the (tank) or tanks. <br />