Laserfiche WebLink
Page 7 <br /> � ' PEkSONNEL <br /> 4.0 Personnel : <br /> 4. 1 Project Manager <br /> -Manages field operations. <br /> -Prepares and organizes the site background review, the <br /> Work Plan, and the field crew. <br /> -Ensures the Work Plan is completed and on schedule. <br /> -Briefs the field teams on their specific assignments. <br /> -Participates in the preparation of the Site Safety <br /> Plan. <br /> -Periodically inspects siteprotective clothing and <br /> equipment . <br /> -Conducts periodic inspections to determine if the Site <br /> Safety Plan is being followod. <br /> -Serves as a liaison with public officials. <br /> -Documents field activities and sample collection.. <br /> 4.2 Site Safety Officer <br /> -Executes the Work Plan and schedule. <br /> -Implements and enforces the SSP. <br /> -Assures that all on-site personnel have received a copy <br /> of the SSP, have read it and understand it . <br /> --Conducts frequent inspections of site conditions„ <br /> facilities, equipment , and activities to daterminc if <br /> the SSP is adequate and being followed . <br /> -Conducts daily "tailgate" meetings to explainthe plan <br /> of work fon- the day, mention potential hazards of the <br /> site. <br /> -Ensures that protective clothing and equipment are <br /> properly stared and maintained . <br /> -knows emergency procedures, excavation routes, and <br /> notifies Local emergency services when nocessrary. <br /> -Notifies the Health and Safety Manager of all accidonts <br /> and injuries that occur on site. <br /> 4.3 On-Site Personnel ; <br /> -Construction personnel ai a to work in a safe and <br /> organized manner . <br /> -Are required to document their fill understaridi "g of <br /> the SSP before starting work: by signing that they have <br /> read the SSP and understand it . <br /> -Safely completes the on -site tasks required to fulfill <br /> the Work Plan. <br /> -Complies with the SSP. <br />