My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1800
>
2300 - Underground Storage Tank Program
>
PR0231036
>
REMOVAL 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 9:48:38 AM
Creation date
11/2/2018 3:51:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1991
RECORD_ID
PR0231036
PE
2361
FACILITY_ID
FA0003761
FACILITY_NAME
ST JOSEPHS HOSPITAL
STREET_NUMBER
1800
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12718044
CURRENT_STATUS
01
SITE_LOCATION
1800 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS\C\CALIFORNIA\1800\PR0231036\REMOVAL\REMOVAL 1991.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 <br /> � ' PEkSONNEL <br /> 4.0 Personnel : <br /> 4. 1 Project Manager <br /> -Manages field operations. <br /> -Prepares and organizes the site background review, the <br /> Work Plan, and the field crew. <br /> -Ensures the Work Plan is completed and on schedule. <br /> -Briefs the field teams on their specific assignments. <br /> -Participates in the preparation of the Site Safety <br /> Plan. <br /> -Periodically inspects siteprotective clothing and <br /> equipment . <br /> -Conducts periodic inspections to determine if the Site <br /> Safety Plan is being followod. <br /> -Serves as a liaison with public officials. <br /> -Documents field activities and sample collection.. <br /> 4.2 Site Safety Officer <br /> -Executes the Work Plan and schedule. <br /> -Implements and enforces the SSP. <br /> -Assures that all on-site personnel have received a copy <br /> of the SSP, have read it and understand it . <br /> --Conducts frequent inspections of site conditions„ <br /> facilities, equipment , and activities to daterminc if <br /> the SSP is adequate and being followed . <br /> -Conducts daily "tailgate" meetings to explainthe plan <br /> of work fon- the day, mention potential hazards of the <br /> site. <br /> -Ensures that protective clothing and equipment are <br /> properly stared and maintained . <br /> -knows emergency procedures, excavation routes, and <br /> notifies Local emergency services when nocessrary. <br /> -Notifies the Health and Safety Manager of all accidonts <br /> and injuries that occur on site. <br /> 4.3 On-Site Personnel ; <br /> -Construction personnel ai a to work in a safe and <br /> organized manner . <br /> -Are required to document their fill understaridi "g of <br /> the SSP before starting work: by signing that they have <br /> read the SSP and understand it . <br /> -Safely completes the on -site tasks required to fulfill <br /> the Work Plan. <br /> -Complies with the SSP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.