My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
2510
>
2300 - Underground Storage Tank Program
>
PR0231037
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:50 AM
Creation date
11/2/2018 3:53:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0231037
PE
2381
FACILITY_ID
FA0003813
FACILITY_NAME
ST JOSEPHS BEHAVIORAL HLTH CTR
STREET_NUMBER
2510
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12536015
CURRENT_STATUS
02
SITE_LOCATION
2510 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CALIFORNIA\2510\PR0231037\REMOVAL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/aHld, <br /> SAN JOAQUIN COUNTY <br /> COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E.IUZELTON AVE..SNOCKION.CA 95205 <br /> (�lN r'iSN i, DEVELOPMENT SERVICES PHONE: 1209)4683120 <br /> PLANNING PHONE:(2091 4683120 , <br /> BUILDING PHONE: 1209)4683123 <br /> NEIGHBORHOOD PBESEDVAvoN PHONE.12091 4683021 <br /> BACKFILL EXCAVATION CERTIFICATE <br /> Project Location 25-16 ZVO CAT Q�Cf/��7� �icr�cyT r� <br /> Owner�7`, Imo:: 'i?l/� if6 V40 one No(:2c/r <br /> Contractor ,,»r.r �-,C ,,$hone N —License No. C / jl�(CN �z <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project. <br /> ---- completion, or <br /> \/ 2. submission of verification, e.g. load ticket, within 30 days of project- <br /> completion that one of the following materials was placed in the excavation In <br /> 12"lifts: <br /> ✓ A. Pea gravel - smooth, rounded material not more than one-half ( I /2) <br /> Inch In diameter. <br /> _ B. Crushed rock - self-compacting material not more than three-quarb;.ru <br /> (3/4) inch in cross sectional measurement. (Use of crushed ru.,I, <br /> will not be permitted for backfill if contact will be made beCwuuu <br /> the backfill material and tanks/pipes made of poly resin glasa ur <br /> similar materials. ) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 dayu <br /> of project completion, or submission of verification that the select material described abovla <br /> will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement slid <br /> chat the entire excavation will be backfilled and compacted to insure compliance with th.. <br /> Uniform Building Code Appendix Chapter 70. <br /> Name rint) <br /> WX* <br /> Signature <br /> * Shall be the responsible managing employee on the license or authorized <br /> agent. <br /> 6/91-1,C/BECERT.DOC ' . <br />
The URL can be used to link to this page
Your browser does not support the video tag.