Laserfiche WebLink
PRECISION G <br /> INDUSTRIES <br /> MAY 4 , 1987 1' <br /> wC. ENVIRCME^+TAL HEALTH <br /> FERTAff/SERVICES <br /> G E N E R A L B . J . J . TRUCKING <br /> ENGINEERING 2431 E . MARIPOSA ROAD <br /> CONTRACTORS STOCKTON , CA 95205 <br /> & S E RVI C E <br /> S T A T 1 O N ATTENTION : NICK COSTA <br /> MAINTENANCE <br /> LICENSE NO. 467293 LOCATION : HEINZ. PLANT , CALIFORNIA & EL DORADO, STOCKTON <br /> RESULTS OF TANK TEST PERFORMED FEBRUARY 17 , 1987 <br /> TANK #1 - 2 ,000 gallon diesel fuel tank - <br /> Full system test indicated a volume change of <br /> +. 017 gallons per hour under test conditions . <br /> Full system test within state guidelines . <br /> RESULTS OF TANK TEST PERFORMED MARCH 2 , 1987 <br /> TANK #2 - 10,000 gallon diesel fuel tank - <br /> Full system test indicated a volume change of <br /> + . 016 gallons per hour under test conditions . <br /> Full system test within state guidelines . <br /> PRECISION INDUSTRIES , INC. <br /> WARREN DEE FOWLES <br /> FIELD SUPERINTENDENT <br /> WDF/psw <br /> 2191 NAVY DR.,STOCKTON,CALIFORNIA 95206 - 209/462-9911 • 800/332-5900 <br />