My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
INSTALL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:36 AM
Creation date
11/2/2018 3:58:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1997
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY FOOD & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
03
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CAMBRIDGE\16470\PR0231532\INSTALL 1997.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. PLAN REVIEW AND OPERATING PERMIT FEES <br /> a. New facility plan review fee of 5624.00 (8 hour minimum per facility), $170.00 fee per <br /> tank, plus 556.00 state surcharge fee per tank is due at time of plan submittal. <br /> b. New installation of an additional tank at an existing facility is $624.00 plan review fee (8 - <br /> hour minimum per facility) plus $170.00 fee per new tank, and 556.00 per tank state <br /> surcharge fee. <br /> C. It should be noted that a $624.00 plan review check fee required for each submittal allows <br /> for up to eight (8) hours of staff review and/or inspection time. Additional time spent on <br /> plan review, meetings, inspections, phone or office consultations will be billed to the <br /> applicant at a rate of $78.00 per hour. <br /> d. The maximum review time for UST installation plans is 40 working days. A preliminary <br /> review will be conducted by the PHS-EHD within 20 working days of submittal date to <br /> identify any gross plan deficiencies. <br /> e. If gross deficiencies are identified, the plans will be returned with a checklist identifying plan <br /> deficiencies. <br /> f. To expedite the review of installation plans, time and a half per hour overtime fee may be <br /> submitted to have review completed within 10 working days of submittal date if staff is <br /> available to perform the review. <br /> 3. PLAIN REVIEW GUIDELINES <br /> a. The enclosed plan review sheet is to be completed and submitted with the three sets of <br /> drawings to PHS-EHD. <br /> b. A copy of the California UST Regulations may be obtained from the California State Water <br /> Resources Control Board at (916) 227.4303. <br /> C. Permits and/or plan check approval may also be required by the San Joaquin Valley Unified <br /> Air Pollution Control District, the County/City Building Department and the Fire District in <br /> your respective area. <br /> d. A minimum of 3 inspections will be conducted on the UST system installation. A S78 per <br /> hour inspection fee shall be charged for additional inspections or reinspection as required. <br /> (See required inspections below) <br /> e. Applicant/contractor to adhere to the approval plan and any change or deviation shall be <br /> reported to and approved by PHS-EHD prior to installation. <br /> f. The application for installation of underground tanks is only valid for the calendar year in <br /> which it has been issued. A permit may be extended into the next calendar year if a letter is <br /> sent to PHS-EHD requesting this extension thirty days prior to the end of the calendar year. <br /> A one time, one year extension may be granted by PHS-EHD upon receipt of this letter. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.